MARKETCABLE ON AIRTune in to any companySign In
Home/Reports/oklo-q2-2026

OKLO

Q2 2026 vs Q2 2025

Oklo Inc. · Energy / advanced nuclear power

Oklo is an advanced nuclear company that reported its first revenue in Q2 2026: $1.21M against none a year earlier, with cost of sales of $0.7M.[K4]

Earnings decoder26 min readabout two minutes briefing

Bottom line

WatchEvidence: verified

Oklo is an advanced nuclear company that reported its first revenue in Q2 2026: $1.21M against none a year earlier, with cost of sales of $0.7M. [K4] Operating expenses were $74.4M (research and development $39.5M, general and administrative $34.2M), the operating loss was $73.2M and the net loss was $48.5M (-$0.28 per share), helped by $23.2M of interest and dividend income. Cash and marketable securities were $3,006.3M, up from $1,412.5M in December, because the company raised $1,851.9M net through its at-the-market (ATM) program in the first half. Capital expenditures were $126.9M in the first half against $1.2M a year earlier. The company states it has no revenue or earnings guidance in the filings read; it does state a first-powerhouse target of 2028. The Q3 results are not out; this report describes only what was published. [K2, K4]

Language check: descriptive only. No ratings, targets or predictions.

  • StatusWatch

    Last results Aug. 7, 2026 (85 days before the Oct. 31 cut-off, calculated). The Oct. 23 notice (wire copy) says Q3 results come before market open Fri. Nov. 6, 2026, call 8:30 a.m. ET. This report is stale after November 6, 2026, when the Oct. 23 notice says Q3 results come (before market open; call 8:30 a.m. ET).

  • RevenueNeutral

    First revenue $1.21M in Q2 2026; about 80% from businesses acquired in June (calculated).

  • SpendingWatch

    Operating expenses $36.3M (Q3 2025), $51.2M (Q1), $74.4M (Q2); first-half capex $126.9M.

  • FundingNeutral

    ATM net proceeds $1,851.9M in H1 2026; cash and marketable securities $3,006.3M.

  • OutlookWatch

    2026 cash used in operations $80M-$100M (10-K); first-half $65.5M; first powerhouse targeted for 2028.

Scope and method
  • Company: Oklo Inc. (OKLO); calendar fiscal year.
  • Window: Form 10-Q for Sep. 2025 (Nov. 2025), Form 10-K for FY2025 (Mar. 17, 2026), Form 10-Q and 10-Q/A for Mar. 2026 (May 12), Form 10-Q for Jun. 2026 (Aug. 2026), a company newsroom page, and the Oct. 23, 2026 date notice.
  • Why filings, not releases: The Business Wire results releases read carry a header, call details and boilerplate only; the figures and statements come from the SEC filings.
  • Tone: Hand-read from company-authored text. No score, ranking, transcript, stock move or analyst estimate.
  • Derived numbers: Labeled "(calculated)".
  • Not read: Management's discussion in the Jun. 2026 10-Q (the text available ended before it); FY2025 revenue and net loss; any results-release figures or quotes.

Periods compared

Matched quarter
A Marketcable plain-English report. Status: pre-release, with a dated notice. Last results: Aug. 7, 2026, the call date shown in the company's release (85 days before the Oct. 31, 2026 cut-off, calculated). A notice dated Oct. 23, 2026 (8 days ago; read through a wire-service copy, the company page was not read) says Q3 results come before market open on Fri. Nov. 6, 2026, with a call at 8:30 a.m. ET (6 days away; 14 days from notice to results, all calculated). Research, not advice. This report is stale after November 6, 2026, when the Oct. 23 notice says Q3 results come (before market open; call 8:30 a.m. ET). [K1-K7]
Annual context
Research cut-off: October 31, 2026. Evidence: Form 10-Q for Sep. 2025 (K1), Form 10-K for FY2025 (K2, Mar. 17, 2026), Form 10-Q and 10-Q/A for Mar. 2026 (K3, May 12), Form 10-Q for Jun. 2026 (K4, Aug. 2026), a company newsroom page (K5), the Q2 results release page (K6, wire copy) and the Q3 date notice (K7, Oct. 23, wire copy).
Forecast period
No revenue or earnings guidance in the filings read. The 10-K states 2026 cash used in operations of $80M to $100M and investing of $350M to $450M, and a first-powerhouse target of 2028. Q3 results November 6, 2026. [K2, K7]
Evidence cutoff
October 31, 2026

What changed

June 2026 quarter first revenue of $1.21M; operating expenses $74.4M; operating loss $73.2M; net loss $48.5M; cash and marketable securities $3,006.3M; H1 ATM net $1,851.9M; Q3 results November 6, 2026.

What Oklo does

K2-K5

Oklo revenue and management tone, by quarter

Total revenue, $M. Zero-based. Revenue is nearly nil against operating costs. Tone hand-read, not scored (chips in Tone shift).

0.000.250.500.751.001.251.501.752.00Sep. 2025Dec. 2025Mar. 2026Jun. 2026Sep. 2026Q3; 10-QNov. 2025operating loss$36.3Mnet loss $29.7M;EPS -$0.20Q4; 10-KMar. 17, 2026operatingexpenses$57.1M (calc.)net lossnot readQ1; releaseMay 12operating loss$51.2Mnet loss $33.1M;EPS -$0.19Q2; releaseAug. 7operating loss$73.2Mnet loss $48.5M;EPS -$0.28Q3Not yetreported.Results beforemarket openFri. Nov. 6,2026; call8:30 a.m. ET(notice datedOct. 23, per awire-servicecopy).No revenue orearningsguidance statedin the filingsreadreportednonefigure: none)(9-monthnot readFY2025 revenuereportednoneread)(first revenuea year earlierfrom none$1.21MReportedquarter

Sources: Oklo Form 10-Q (Sep. 2025), 10-K (FY2025), 10-Q and 10-Q/A (Mar. 2026), 10-Q (Jun. 2026), newsroom page and Oct. 23, 2026 date notice (K1-K7). calc. = calculated from stated figures. Under each quarter: operating loss or expenses, net loss and EPS where read. The Sep. 2026 quarter is not yet reported: results before market open Fri. Nov. 6, 2026; call 8:30 a.m. ET (notice dated Oct. 23, per a wire-service copy); no revenue or earnings guidance stated in the filings read. Oklo's results releases read carry only a header, call details and boilerplate; figures and statements here come from its Form 10-Q and 10-K filings and a company newsroom page. Quotes are excerpts. The Q2 10-Q text read ends before management's discussion. Aggregator and transcript pages are not used. The filing-lead, check and outlook rows from the same chart are in Tone shift. Hand-read, not a score.

Operating expenses

As stated, $M. Q4 = FY2025 $139.3M less nine months $82.2M (calculated, hatched).

0102030405060708090Sep. 2025Dec. 2025Mar. 2026Jun. 2026(calc.)$14.9M$21.4M$36.3M$57.1M$27M$24.2M$51.2M$39.5M$34.2M$74.4MR&DG&ATotal, calculated

Sources: Oklo filings (K1-K5). Q2 cash used in operations and capex are calculated as six months ($65.5M; $126.9M) less Q1. Increases in cash and securities of $229.0M (Dec.), $1,124.4M (Mar.) and $469.4M (Jun.) are calculated; the company reports ATM net proceeds of $1,851.9M in H1 2026. A $1.5B ATM program (2025) was completed in Q1 2026; a $1.0B gross program (2026) was ongoing at Jun. 30, 2026, remaining capacity not stated. Stock-based compensation $29.9M in H1 2026. Long-term debt $0.7M. A $25.0M right-of-first-refusal liability is tied to future power purchases. Operating expenses $36.3M (Sep. 2025 qtr: R&D $14.9M, G&A $21.4M), $57.1M (Dec. 2025 qtr, calculated as FY2025 $139.3M less nine months $82.2M), $51.2M (Mar. 2026: R&D $27.0M, G&A $24.2M), $74.4M (Jun. 2026: R&D $39.5M, G&A $34.2M).

Operating loss and net loss

As stated, $M. Interest income $23.2M in Q2 2026. Negative below zero.

-80-60-40-200Sep. 2025Mar. 2026Jun. 2026-$36.3M-$51.2M-$73.2M-$29.7M-$33.1M-$48.5MOperatinglossNet loss

Sources: Oklo filings (K1-K5). Q2 cash used in operations and capex are calculated as six months ($65.5M; $126.9M) less Q1. Increases in cash and securities of $229.0M (Dec.), $1,124.4M (Mar.) and $469.4M (Jun.) are calculated; the company reports ATM net proceeds of $1,851.9M in H1 2026. A $1.5B ATM program (2025) was completed in Q1 2026; a $1.0B gross program (2026) was ongoing at Jun. 30, 2026, remaining capacity not stated. Stock-based compensation $29.9M in H1 2026. Long-term debt $0.7M. A $25.0M right-of-first-refusal liability is tied to future power purchases. Operating loss $36.3M, $51.2M and $73.2M; net loss $29.7M, $33.1M and $48.5M.

Cash and marketable securities

As stated, $M. Zero-based.

0500100015002000250030003500Sep. 2025Dec. 2025Mar. 2026Jun. 20269M ops $48.7M,capex $6.3MQ1: ops $17.9M,capex $32.8M,ATM $1,181.9MQ2: ops $47.6M,capex $94.1M(calc.), ATM$670.0M$1,183.6M$1,412.5M$2,536.9M$3,006.3MCash andmarketablesecurities

Sources: Oklo filings (K1-K5). Q2 cash used in operations and capex are calculated as six months ($65.5M; $126.9M) less Q1. Increases in cash and securities of $229.0M (Dec.), $1,124.4M (Mar.) and $469.4M (Jun.) are calculated; the company reports ATM net proceeds of $1,851.9M in H1 2026. A $1.5B ATM program (2025) was completed in Q1 2026; a $1.0B gross program (2026) was ongoing at Jun. 30, 2026, remaining capacity not stated. Stock-based compensation $29.9M in H1 2026. Long-term debt $0.7M. A $25.0M right-of-first-refusal liability is tied to future power purchases. Cash and marketable securities $1,183.6M (Sep. 2025), $1,412.5M (Dec. 2025), $2,536.9M (Mar. 2026), $3,006.3M (Jun. 2026). Nine months to Sep. 2025: operations $48.7M, capex $6.3M; Q1 2026: operations $17.9M, capex $32.8M, ATM $1,181.9M; Q2 2026: operations $47.6M, capex $94.1M (calculated), ATM $670.0M.

Business

Oklo is developing "fast fission power plants" it calls powerhouses (the Aurora line is "designed to produce between 15 and 75 megawatts of electricity"), plus a fuel recycling and fabrication business and a radioisotope business built partly on Atomic Alchemy, which it acquired in February 2025. The first Aurora powerhouse is planned at Idaho National Laboratory under the Department of Energy. In June 2026 it acquired ARMEC and Creative Engineers for $33.4M combined. Prospective power customers named in the Q1 filing include Meta, Equinix, Diamondback Energy, Prometheus Hyperscale and Switch; the filing describes letters of intent and memoranda of understanding, with binding agreements still to be negotiated. [K2-K4]

Management's current explanation

Aug. 2026, company newsroom, CEO Jacob DeWitte: "Reaching criticality in less than a year is an incredible milestone for our team." May 12, 10-Q: the Aurora-INL powerhouse was "approved to proceed under DOE purview", and Kiewit was "selected as the lead constructor". Mar. 17, 10-K: "We have an ambitious target of deploying our first powerhouse in 2028." [K2, K3, K5]

Concentration

No customer is named as a share of revenue. Of the $1.21M, $968K came from the businesses acquired in June 2026 (stated; about 80% of revenue, calculated). Gap on the remainder. [K4]

Commercial boundary

No power plant is operating. The company's target for the first powerhouse is 2028, and it says it is "uncertain when, if at all, we will obtain NRC approvals". A $25.0M right-of-first-refusal liability is "effectively a nonrefundable upfront payment that will be attributed to future power delivery" (Q2 10-Q). [K2, K4]

What is working / not working

K1-K5

Stated by the companyFigures in the filings
First revenue$1.21M in Q2 2026: engineering and consulting $0.80M, manufacturing and fabrication $0.17M, other $0.24M
Funded by stock salesATM net proceeds $1,181.9M (Q1) and $670.0M (Q2)
Spending risingOperating expenses $36.3M (Q3 2025), $51.2M (Q1), $74.4M (Q2)
Building outCapital expenditures $32.8M (Q1) and $94.1M (Q2, calculated)
Reactor milestoneCompany page says its Groves test reactor reached first criticality (see flagged language)

What changed

K1-K4

MetricQ3 2025Q4 2025Q1 2026Q2 2026
Revenuenonenot readnone$1.21M
R&D / G&A$14.9M / $21.4Mnot read$27.0M / $24.2M$39.5M / $34.2M
Operating expenses$36.3M$57.1M (calculated)$51.2M$74.4M
Operating loss$36.3Mnot read$51.2M$73.2M
Net loss$29.7Mnot read$33.1M$48.5M
Cash used in operations9 months $48.7Mnot read$17.9M$47.6M (calculated)
Capital expenditures9 months $6.3Mnot read$32.8M$94.1M (calculated)
Cash and securities$1,183.6M$1,412.5M$2,536.9M$3,006.3M
Shares outstanding156.2M160.5Mnot read185.1M
Calculated

Q4 2025 operating expenses are FY2025 ($139.3M) less nine months ($82.2M). Shares outstanding rose 15.3% from December to June. [K1, K2, K4]

Against the latest forecast

K2, K4

First-half 2026 revenue by type

As stated, $M. Total $1.21M; all recognized in Q2.

0.00.20.40.60.81.0EngineeringManufacturingOtherEngineering andconsultingManufacturingand fabrication$0.8M$0.168M$0.242MRevenue

Sources: Oklo filings (K2-K5). Arithmetic, not a forecast: first-half operating cash use was 66% to 82% of the stated $80M-$100M range (calculated). The 10-K also states 2026 cash used in investing of $350M to $450M; the 10-Q reports $912.7M for six months, which includes purchases of marketable securities, so the two are not on the same basis and are not compared. Capital expenditures were $126.9M for six months. Shares outstanding rose 15.3% from Dec. 31, 2025 to Jun. 30, 2026 (calculated), with about 23.1M shares issued through the ATM in H1 2026. First-half 2026 revenue by type: engineering and consulting $0.8M, manufacturing and fabrication $0.168M, other $0.242M (total $1.21M; all recognized in Q2).

Operating cash use vs 2026 outlook

As stated, $M. Box: 2026 outlook for cash used in operations (10-K, Mar. 17); bar: first-half 2026 reported (six-month cash used in operations).

0204060801001202026 outlookH1 2026cash used inoperations(10-K, Mar. 17)reported$100M$80M$65.5M2026outlookFirst halfreported

Sources: Oklo filings (K2-K5). Arithmetic, not a forecast: first-half operating cash use was 66% to 82% of the stated $80M-$100M range (calculated). The 10-K also states 2026 cash used in investing of $350M to $450M; the 10-Q reports $912.7M for six months, which includes purchases of marketable securities, so the two are not on the same basis and are not compared. Capital expenditures were $126.9M for six months. Shares outstanding rose 15.3% from Dec. 31, 2025 to Jun. 30, 2026 (calculated), with about 23.1M shares issued through the ATM in H1 2026. 2026 outlook for cash used in operations $80M-$100M (10-K, Mar. 17); first-half 2026 reported $65.5M.

Shares outstanding

As stated, millions of shares. Zero-based.

050100150200Dec. 2024Sep. 2025Dec. 2025Jun. 2026137.7M156.2M160.5M185.1MSharesoutstanding

Sources: Oklo filings (K2-K5). Arithmetic, not a forecast: first-half operating cash use was 66% to 82% of the stated $80M-$100M range (calculated). The 10-K also states 2026 cash used in investing of $350M to $450M; the 10-Q reports $912.7M for six months, which includes purchases of marketable securities, so the two are not on the same basis and are not compared. Capital expenditures were $126.9M for six months. Shares outstanding rose 15.3% from Dec. 31, 2025 to Jun. 30, 2026 (calculated), with about 23.1M shares issued through the ATM in H1 2026. Shares outstanding 137.7M (Dec. 2024), 156.2M (Sep. 2025), 160.5M (Dec. 2025), 185.1M (Jun. 2026).

Cash-use outlook

The 10-K states 2026 expected cash used in operations of $80M to $100M. First-half cash used in operations was $65.5M (stated), 66% to 82% of that range (calculated). The Q2 10-Q text read does not restate the outlook. No revenue guidance is stated. The charts show first-half revenue by type, operating cash use against the 2026 outlook (box; the year is not yet reported) and shares outstanding. [K2, K4]

Current-year forecast

K2, K4

Stated

None for revenue.

Arithmetic, not a forecast

Operating cash used in the first half was $65.5M against a stated $80M to $100M for the year. [K2, K4]

Outlook history

K1-K4

DateLanguage
Nov. 2025 (10-Q)"aiming to reach criticality by July 4, 2026 or as soon as possible thereafter"
Mar. 17, 2026 (10-K)First powerhouse "ambitious target" of 2028; 2026 operating cash used $80M to $100M; investing $350M to $450M
May 12 (10-Q)Same 2028 target and cash outlook; powerhouses "could be operating cash flow positive from the first year of operation"
Aug. 2026 (10-Q)Cash "sufficient" for one year; no dollar outlook in the text read
Plain English

Oklo has almost no sales yet and spends about $74M a quarter on operations. It paid for that, and for building, with about $1.85B raised from stock sales in the first half. Its first power plant is targeted for 2028. [K2, K4]

Assumptions to retain

The 10-K investing outlook ($350M to $450M) and the 10-Q's six-month investing outflow ($912.7M) are not on the same basis: the latter includes purchases of marketable securities. Q2 other non-operating expense and income tax lines are presented with inconsistent signs in the extraction; the net loss reconciles. A Form 10-Q/A for Q1 changed only the CFO certification signature; no figures changed.

Filing changes

K4

Status

Q2 10-Q adds first revenue, two acquisitions ($33.4M), ARMEC earnout consideration ($3.1M fair value at acquisition, maximum $5.0M), and a debt balance of $0.7M (none at Dec. 31, 2025). The 2025 ATM program ($1.5B) was completed in Q1 2026; a $1.0B gross program (2026) was ongoing at June 30, remaining capacity not stated. [K4]

Metric evolution / quality of earnings

K4

Interest income

Net loss is narrower than operating loss because of interest income ($23.2M in Q2). Stock-based compensation was $29.9M in the first half. Weighted-average shares were 176.2M against 140.1M a year earlier. [K4]

Capital and event tracker

K1-K7

DateEvent
Q2 2025Public offering, $440.1M net
Q3 2025ATM, $526.1M net
Dec. 2025ATM, $300.0M gross; 2025 program closed Jan. 28, 2026
Q1 2026ATM, $1,181.9M net
Q2 2026ATM, $670.0M net; ARMEC and Creative Engineers acquired
Aug. 2026Q2 results; Groves criticality page (dated 08.06.26)
Oct. 23Date notice (wire copy)
Nov. 6Q3 results before the open; call 8:30 a.m. ET
In plain English

Oklo reports revenue, operating expenses, operating and net loss, cash use, capex, ATM proceeds and cash in its SEC filings; it states a 2026 operating cash-use outlook but no revenue or earnings guidance. [K1-K4]

Mixed signals

detected

Three pairs of signals pointing different ways.

Descriptive only.

Mixed-signal panel
Pointing upPointing down
Cash and securities $3,006.3MOperating loss up each quarter
First revenue; reactor criticality reportedRevenue about nil against $74.4M of costs
10-Q says cash sufficient for one yearShares up 15.3% since December (calculated)

Descriptive only.

Conclusion

[K2-K5]

Language we flagged

Six flags: the criticality date, ambitious and cautionary statements in one filing, the cash-use outlook against capex, "first revenue", releases without figures and the right-of-first-refusal liability.

Each flag carries the language, where it appears and why it is flagged.

“Nov. 2025: "aiming to reach criticality by July 4, 2026 or as soon as possible thereafter". Newsroom: Groves "Achieves First Criticality in Under a Year" (page dated 08.06.26)”
Said Aug 7, 2026Company filing, no named speaker · Nov. 2025 10-Q / newsroom page
Ambiguous date MONITORING
What to test

The page date is ambiguous (Aug. 6 or June 8). The 10-Q notes read do not mention it, so whether it came before or after July 4 is not resolved here.

What was said before

Yes

“"ambitious target" of 2028; "uncertain when, if at all" for NRC approvals; powerhouses "could be operating cash flow positive from the first year"”
Said Mar 17, 2026Company filing, no named speaker · 10-K
Mixed statements MONITORING
What to test

Optimistic and cautionary statements sit in the same filing.

What was said before

Yes

“2026 cash use outlook $80M to $100M (operating)”
Said Mar 17, 2026Company filing, no named speaker · 10-K
Basis MONITORING
What to test

First-half capital expenditures alone were $126.9M, and the investing outlook ($350M to $450M) is on a different basis; not reconciled.

What was said before

Yes

“"first revenue"”
Said Aug 7, 2026Company filing, no named speaker · Q2 10-Q
Acquired revenue MONITORING
What to test

About 80% came from businesses acquired in June (calculated); not from reactors.

What was said before

Yes

“Results releases carry no figures or quotes”
Said Aug 7, 2026Company filing, no named speaker · Business Wire release copies
Source limit MONITORING
What to test

The tone read here rests on filings and one newsroom page.

What was said before

Yes

“$25.0M right-of-first-refusal liability”
Said Aug 7, 2026Company filing, no named speaker · Q2 10-Q
Undated obligation MONITORING
What to test

Attributed to future power delivery; no delivery date is stated.

What was said before

Yes

Decoder

Criticality

"criticality" means a sustained controlled chain reaction in a test reactor; it is not power delivered to a customer.

Flags identify what to verify, not intent or misconduct.

Tone shift

  1. Sep. 2025 qtr (Nov. 2025 10-Q (Q3 2025))What the filing or release led with (excerpts): 10-Q note: "aiming to reach criticality by July 4, 2026 or as soon as possible thereafter." Cash to "fund construction of its powerhouses."
    • Check against the figures: Revenue none; operating loss $36.3M; cash and securities $1,183.6M; ATM $526.1M net in the quarter
    • Outlook language: Criticality aim: July 4, 2026 or "as soon as possible thereafter"
  2. Dec. 2025 qtr (Mar. 17, 2026 10-K (Q4 2025))What the filing or release led with (excerpts): 10-K: "We have an ambitious target of deploying our first powerhouse in 2028." Expected 2026 cash used in operations $80M-$100M; investing $350M-$450M
    • Check against the figures: Operating expenses $139.3M for FY2025; cash and securities $1,412.5M; 2025 ATM closed Jan. 28, 2026
    • Outlook language: First powerhouse target 2028; criticality date not in the excerpt read
  3. Mar. 2026 qtr (May 12, 2026 10-Q (Q1 2026))What the filing or release led with (excerpts): Aurora-INL "approved to proceed under DOE purview"; Kiewit "selected as the lead constructor"; powerhouses "could be operating cash flow positive from the first year"
    • Check against the figures: Revenue none; operating loss $51.2M; cash and securities $2,536.9M; ATM $1,181.9M net; capex $32.8M
    • Outlook language: "It is uncertain when, if at all, we will obtain NRC approvals"; "ambitious target" of 2028; criticality date not in the excerpt read
  4. Jun. 2026 qtr (Aug. 2026 10-Q and newsroom (Q2 2026))What the filing or release led with (excerpts): Notes: first revenue ($1.21M); two acquisitions (ARMEC, Creative Engineers); cash "sufficient" for one year. Groves reactor release: "Reaching criticality in less than a year" (page dated 08.06.26)
    • Check against the figures: Revenue $1.21M; operating loss $73.2M; cash and securities $3,006.3M; ATM $670.0M net; capex $94.1M (calc.)
    • Outlook language: Criticality date not in the notes read; no statement of when the first powerhouse will operate in the text read
  5. Sep. 2026 qtr (Q3)Unreported: results Nov. 6, 2026 (6 days from Oct. 31, calc.)
What the filing or release led with and the check against the figurescalc. = calculated from stated figures. Oklo's results releases read carry only a header, call details and boilerplate; figures and statements here come from its Form 10-Q and 10-K filings and a company newsroom page. Quotes are excerpts. The Q2 10-Q text read ends before management's discussion. Aggregator and transcript pages are not used. Sources: Oklo Form 10-Q (Sep. 2025), 10-K (FY2025), 10-Q and 10-Q/A (Mar. 2026), 10-Q (Jun. 2026), newsroom page and Oct. 23, 2026 date notice. Hand-read, not a score. [K1-K7]
Tone scoreNot counted: no phrase rates per 1,000 words in this edition. A counted version needs call audio transcribed with Whisper (brainstorm 2.1).

Marketcable's standard measures qualifier and hedge usage per 1,000 words against the company's own prior calls. That count is not in this edition (see Scope and method). The chips below show hand-read signals from filings and the newsroom page: what each led with, a check against the figures and the outlook language. There is no scale and no ranking of confidence.

Vocal tone: not analysedAudio was not reviewed. Tone here means the written stance of the filings and the newsroom page.

What shifted

Nov. 2025 10-Q (Q3 2025): led with "aiming to reach criticality by July 4, 2026" (dated target, with an "as soon as possible thereafter" hedge). Mar. 17, 2026 10-K (Q4 2025): led with "ambitious target of deploying our first powerhouse in 2028" (self-described ambitious). May 12, 2026 10-Q (Q1 2026): led with "approved to proceed under DOE purview"; "could be operating cash flow positive" (progress-focused, with NRC uncertainty stated). Aug. 2026 10-Q and newsroom (Q2 2026): led with "Reaching criticality in less than a year is an incredible milestone" (newsroom; celebratory). Hand-read. No score, ranking or label. [K1-K5]

4 filings compared
  1. Nov. 2025 10-Q (Q3 2025)Nov 11, 2025Company filing, no named speaker

    Emphasis10-Q note: "aiming to reach criticality by July 4, 2026 or as soon as possible thereafter." Cash to "fund construction of its powerhouses."

    Our readingLed with (hand-read): "aiming to reach criticality by July 4, 2026" (dated target, with an "as soon as possible thereafter" hedge). [1]

  2. Mar. 17, 2026 10-K (Q4 2025)Mar 17, 2026Company filing, no named speaker

    Emphasis10-K: "We have an ambitious target of deploying our first powerhouse in 2028." Expected 2026 cash used in operations $80M-$100M; investing $350M-$450M

    Our readingLed with (hand-read): "ambitious target of deploying our first powerhouse in 2028" (self-described ambitious). [2]

  3. May 12, 2026 10-Q (Q1 2026)May 12, 2026Company filing, no named speaker

    EmphasisAurora-INL "approved to proceed under DOE purview"; Kiewit "selected as the lead constructor"; powerhouses "could be operating cash flow positive from the first year"

    Our readingLed with (hand-read): "approved to proceed under DOE purview"; "could be operating cash flow positive" (progress-focused, with NRC uncertainty stated). [3]

  4. Aug. 2026 10-Q and newsroom (Q2 2026)Aug 7, 2026Jacob DeWitte (CEO), newsroomThis call

    EmphasisNotes: first revenue ($1.21M); two acquisitions (ARMEC, Creative Engineers); cash "sufficient" for one year. Groves reactor release: "Reaching criticality in less than a year" (page dated 08.06.26)

    Our readingLed with (hand-read): "Reaching criticality in less than a year is an incredible milestone" (newsroom; celebratory). [4]

Tone read

Nov. 2025 10-Q: dated target, with an "as soon as possible thereafter" hedge. Mar. 17 10-K: self-described ambitious. May 12 10-Q: progress-focused, with NRC uncertainty stated. Aug. 2026 (newsroom): celebratory. [K1-K5]

Limits

Hand-read, not scored. Not a prediction.

Historical outcomes

VERIFIED

One stated dated target read: criticality by July 4, 2026 "or as soon as possible thereafter". The company reports criticality; the page date is ambiguous, so it is not graded. Lesson: the dated aim carried its own hedge, and the check depends on a date the source does not make clear. [K1, K5]

Dated target graded

Evidence

0 of 1 (criticality date ambiguous)

Interpretation

Not graded.

CaveatWithin-company count.

Nov 11, 2025open
What was signalled

Criticality by July 4, 2026 "or as soon as possible thereafter" [K1]

What happened

Groves "Achieves First Criticality in Under a Year" (page dated 08.06.26) [K5]

Lesson

Not graded: the page date is ambiguous.

Do not rewrite the old promise

Mar 17, 2026open
What was signalled

2026 cash used in operations $80M to $100M; first powerhouse targeted for 2028, as issued [K2]

What happened

No later result yet. This case is still open.

Lesson

Results due Nov. 6.

Recorded for each statement
  • Date
  • Speaker
  • Wording
  • Measure
  • Later figure
  • Source

How to read these casesWithin company counts

Share-price studyNot performed. No share-price reaction was verified, and nothing is loaded into the site's reaction map.

BoundaryWithin-company counts, sample size one. Description, not prediction.

Company saga

Current chapter

Funded by stock sales

Oklo raised about $968M in the first nine months of 2025 and $1.85B net in the first half of 2026, and reported its first revenue in Q2 2026 while building toward a 2028 first powerhouse.

The story so far
  1. Nov. 2025 to Oct. 2026

    10-Q (Nov. 2025), 10-K (Mar. 17), 10-Q and 10-Q/A (May 12), 10-Q (Aug. 2026), Groves newsroom page and Oct. 23 date notice. CEO Jacob DeWitte is quoted on the newsroom page. [K1-K7]

Key characters

People: Jacob DeWitte, CEO.

Still open

The Groves criticality date; capital spending against the cash outlook; revenue from acquisitions; the 2028 powerhouse.

Open questions

Questions the filings raise.

  1. 01The date and scope of the Groves criticality.
  2. 02How the 2026 cash outlook compares with capital spending.
  3. 03What share of revenue is from acquisitions.
What the Q&A left out

Analyst Q&A tension (questions for the next call)

Answered

Not read; no transcript used.

Missing

Questions the filings raise: the date and scope of the Groves criticality, how the 2026 cash outlook compares with capital spending, and what share of revenue is from acquisitions.

What to watch next

  • Alerts

    Nov. 6 release before the open; call 8:30 a.m. ET.

  • My Focus

    Cash use against the $80M-$100M outlook, capital spending, ATM use, powerhouse timing.

The Cable

Two-minute script. About 185 words. Audio order: Bottom line, Flagged language, Tone shift, What to watch next.

Transcript

Look for three things.

Bottom line. Oklo last reported on August seventh, eighty-five days ago. It reported its first revenue, one point two million dollars in the second quarter, against operating costs of seventy-four million. The operating loss was seventy-three million and the net loss forty-nine million. Cash and securities were about three billion, after one point eight five billion raised from stock sales in the first half.

Flagged language. The filings aimed at criticality by July fourth, or as soon as possible after. The company says its Groves test reactor reached it, but the page date is unclear and the quarterly filing text read does not mention it. Capital spending was ninety-four million in the second quarter by arithmetic. About eighty percent of revenue came from businesses acquired in June.

Tone shift. November: aiming at July fourth. March: an ambitious target of twenty twenty-eight. May: approved to proceed. August: an incredible milestone.

What to watch next. Results come before the open on Friday, November sixth, with a call at eight-thirty Eastern. Look at capital spending against the cash outlook, revenue sources, and the powerhouse timeline.

About 185 words. Research, not advice. A script, not a recording.

Primary sources

Read on Oct 31, 2026.

  1. 01Form 10-Q, Sep. 30, 2025 (K1)SEC EDGAR · Nov 11, 2025
  2. 02Form 10-K, FY2025 (K2)SEC EDGAR · Mar 17, 2026
  3. 03Form 10-Q/A, Mar. 31, 2026 (K3)SEC EDGAR · May 12, 2026
  4. 04Form 10-Q, Jun. 30, 2026 (K4)SEC EDGAR · Aug 7, 2026
  5. 05Company newsroom: Groves reactor first criticality (K5)Press release · Oklo newsroom

Supporting sources

Not primary sources. These come from other publishers and may contain errors.

  1. 06Q2 results release page (Business Wire copy) (K6)Press release · Wire-service copy · Aug 7, 2026
  2. 07Q3 date notice, Oct. 23, 2026 (wire copy) (K7)Press release · Wire-service copy · Oct 23, 2026

How this report was made

research cutoff
October 31, 2026. [K1-K7]
next results
Friday, November 6, 2026, Q3 results before market open, with a call at 8:30 a.m. ET, per a notice dated October 23, 2026 (wire-service copy; the company page was not read). Days since last results: 85 (calculated). Since the notice: 8. To results: 6. Notice to results: 14 days (calculated). This report is stale after November 6, 2026, when the Oct. 23 notice says Q3 results come (before market open; call 8:30 a.m. ET). [K7]
company
Oklo Inc. (OKLO); calendar fiscal year
window
Form 10-Q for Sep. 2025 (Nov. 2025), Form 10-K for FY2025 (Mar. 17, 2026), Form 10-Q and 10-Q/A for Mar. 2026 (May 12), Form 10-Q for Jun. 2026 (Aug. 2026), a company newsroom page, and the Oct. 23, 2026 date notice
why filings, not releases
The Business Wire results releases read carry a header, call details and boilerplate only; the figures and statements come from the SEC filings
tone
Hand-read from company-authored text. No score, ranking, transcript, stock move or analyst estimate
derived numbers
Labeled "(calculated)"
not read
Management's discussion in the Jun. 2026 10-Q (the text available ended before it); FY2025 revenue and net loss; any results-release figures or quotes
sources
K1 to K4 are SEC filings (Forms 10-Q, 10-K and 10-Q/A). K5 is the company's newsroom page. K6 and K7 are wire-service copies of the Q2 results release and the Q3 date notice, used for dates only. Company filings control facts.
not used / gaps
Management's discussion in the Jun. 2026 10-Q not read; FY2025 revenue and net loss not read. No results-release figures or quotes (the releases read carry only boilerplate). No transcripts, aggregator, trade-press or estimate pages used. Date of the Groves criticality not resolved.
disclaimer
Marketcable is research, not advice. Nothing here is a recommendation about buying, selling or holding any security.
verification
At abd's request Marketcable placed the edition as written and did not re-check numbers or add analysis.
changes from abd's edition
The edition is placed as written. The Scope and method table sits under the bottom line and again in this Methodology, row by row. What Oklo does (with management's current explanation, concentration and the commercial boundary as notes) is one block; What is working / not working, What changed (with the calculated note), Against the latest forecast, Current-year forecast, Outlook history (with Plain English and Assumptions to retain as notes), Filing changes, Metric evolution and the Capital and event tracker are blocks. The three chart images are redrawn as native charts from the numbers on the images: revenue by quarter (zero-based; quarters with no revenue labelled; the Sep. 2026 column left empty as scheduled for Nov. 6) sits at the top of the business block because the bottom line takes no chart; the filing-lead, check and outlook rows from the same image sit in Tone shift as chips. Operating expenses (stacked; the calculated Dec. 2025 total hatched), operating and net loss, and cash and marketable securities sit in the business block. First-half revenue by type, operating cash use against the 2026 outlook (box; the year is not yet reported, so no diamond) and shares outstanding sit on "Against the latest forecast". The notice gives the report a stale date (Next results above). No figures changed.
left out of this edition
The daily-use digest and the TODO(legal) notes; the alerts and My Focus appear as the watchlist, and the source desk is the source list.