MARKETCABLE ON AIRTune in to any companySign In
Home/Reports/ge-q2-2026

GE

Q2 2026 vs Q2 2025

GE Aerospace · Aerospace / jet engines and services

GE Aerospace's Q2 2026 adjusted revenue rose 24% to $12.6B (GAAP revenue +21% to $13.3B), led by Commercial Engines & Services services revenue up 26%; adjusted EPS rose 22% to $2.02 and free cash flow 43% to $3.0B, while the operating margin fell 130 basis points to 21.7%.FY2026 guidance was raised on every measure, to adjusted EPS of $7.65-7.85 and free cash flow of $8.9-9.2B.On September 8 GE agreed to buy castings maker CPP for $11.75B, closing expected in the second half of 2027.

Earnings decoder25 min readapproximately 2 minutes briefing
CPP agreement signed, not completed

Acquisition agreed after this quarter

The agreement adds no revenue, cash or debt to the Q2 figures in this report. Until closing, CPP is a commitment: about $11.75B of capital, new borrowing and integration work whose returns are company estimates.

Which GE
GE here is GE Aerospace: General Electric Company (SEC CIK 40545), trading as GE on the NYSE. It is not GE Vernova (spun off April 2024, ticker GEV) or GE HealthCare (spun off January 2023, ticker GEHC); GE Vernova's former business sits in GE Aerospace's discontinued operations.
Company
Consolidated Precision Products (CPP), Cleveland: investment and sand castings, mostly airfoils and structural parts; about 6,600 employees at more than 20 sites; owned by Warburg Pincus and Berkshire Partners. GE has been a customer for over 15 years.
Announced
2026-09-08 (8-K Items 7.01 and 8.01; presentation and release furnished as Exhibits 99.1 and 99.2).
Consideration
Cash purchase price of $11.75B, subject to closing adjustments; financed with $7B of cash and new debt for the rest. About 26x CPP's 2027 EBITDA, or about 18x counting expected net synergies (about $200M by year three, per the presentation).
Size
CPP's estimated 2027 revenue is about $2.0B (presentation): about 60% commercial aerospace, 20% defense, 20% power and other.
Company expectations
Adjusted EPS and FCF accretive in year one, excluding one-time costs and deal amortization; double-digit ROIC by year five; "No change to capital allocation plans".
Evidence needed
Regulatory approvals and closing (expected second half of 2027), final price, financing cost, integration cost, synergies realized net of investment, and supply to CPP's other customers.

Bottom line

Mixed with watchpointsEvidence: verified

GE Aerospace's Q2 2026 adjusted revenue rose 24% to $12.6B (GAAP revenue +21% to $13.3B), led by Commercial Engines & Services services revenue up 26%; adjusted EPS rose 22% to $2.02 and free cash flow 43% to $3.0B, while the operating margin fell 130 basis points to 21.7%. FY2026 guidance was raised on every measure, to adjusted EPS of $7.65-7.85 and free cash flow of $8.9-9.2B. On September 8 GE agreed to buy castings maker CPP for $11.75B, closing expected in the second half of 2027.

Commercial services drove the quarter: more shop visits, more spare parts and better pricing, with engine deliveries up 26%. Profit grew more slowly than revenue because new-engine deliveries, investment and inflation diluted margins, and Q2 FCF had help from customer allowances. Full-year guidance went up on every measure after April's hold. The CPP agreement is a large bet on castings capacity whose returns are still forecasts. GE here means GE Aerospace, not GE Vernova or GE HealthCare.

  • Reported factPositive

    Adjusted revenue $12,634M against $10,151M (+24%); GAAP revenue $13,349M against $11,023M (+21%), the gap being run-off insurance revenue ($715M against $872M). Orders $16.5B (+17%).

  • SegmentsMixed

    CES revenue $9,731M (+27%): services $7,434M (+26%), equipment $2,297M (+30%); profit +20% but margin 27.3% against 28.9%. DPT revenue $3,443M (+16%), profit $475M (+18%), margin 13.8%.

  • EarningsPositive

    Adjusted EPS $2.02 against $1.66 (+22%); continuing EPS (GAAP) $2.30 against $1.87 (+23%). Operating profit (non-GAAP) $2,746M (+18%), margin 21.7% against 23.0%. Diluted shares 1,047M against 1,071M.

  • Cash and outlookMixed

    CFOA $3,258M (+39%); FCF $3,027M (+43%), 143% of adjusted net income. First-half allowances added $956M of cash. FY2026 adjusted EPS guide $7.65-7.85 (was $7.10-7.40); FCF $8.9-9.2B (was $8.0-8.4B).

Reported
  • Adjusted revenue +24%; CES services +26%.
  • Operating margin 21.7%, down 130 bps.
  • Adjusted EPS $2.02 (+22%); FCF $3.0B (+43%).
Company explanation
  • "Robust services growth" and FLIGHT DECK (Culp, release).
  • "record internal shop visit output" (Culp, release).
  • Guidance raised "across the board".
Our test
  • CES margin stabilising as equipment deliveries ramp.
  • Second-half FCF without the allowance build.
  • CPP closing terms, cost and net synergies.
Evidence boundary
  • Latest reported quarter is Q2 2026; Q3 had not been reported at the cutoff. The four call transcripts, the July presentation and the company's CPP page could not be reached from here; call figures (spare-parts delinquency, the EPS bridge) are as the source model gives them and are marked so. The original audio was not reviewed. No score, rating or price view is given.

Periods compared

Matched quarter
Quarters ended June 30, 2026 and June 30, 2025; four calls from Q3 2025 (October 2025) to Q2 2026 (July 2026). The September 8 CPP agreement and September 21 board changes come after the quarter. Q3 2026 had not been reported at the October 15 cutoff.
Forecast period
Full year 2026; CPP's first year after an expected second-half 2027 closing only as the company describes it

What changed

Two revenue lines, two profit lines, two EPS lines.

Where the growth came from

Q2 2026 10-Q, segment detail

LineQ2 2026Q2 2025Change
CES services$7,434M$5,881M+26%
CES equipment$2,297M$1,765M+30%
DPT Defense & Systems$2,213M$1,981M+12%
DPT Propulsion & Additive Technologies$1,230M$997M+23%
Commercial engine units659525+26%
of which LEAP510410+24%
Defense & Systems engine units199186+7%
Run-off insurance revenue$715M$872M-18%
Dollars

CES services added $1,553M of the $2,483M rise in adjusted revenue; CES equipment $532M; DPT $465M.

Deliveries, two bases

The release's "31% growth in total engine deliveries in the first half" counts commercial and Defense & Systems units together (1,683 against 1,286 on our arithmetic). Commercial units alone rose 37% (1,299 against 951), as the 10-Q says.

"Install engines"

The margin explanation refers to new engines delivered for installation on new aircraft, which earn less than spare engines and aftermarket work. It does not mean the installed fleet.

Four checkpoints: services strong, margins below last year

Results releases and 10-Qs, Q3 2025 to Q2 2026

QuarterOrdersAdjusted revenueOperating marginCES services / equipment growthCES marginCommercial / LEAP unitsAdjusted EPS (GAAP continuing)FCF (conversion)
Q3 2025$12.8B (+2%)$11,305M (+26%)20.3% (flat)+28% / +22%27.4% (+170 bps)664 / 511$1.66, +44% ($2.04)$2,362M (134%)
Q4 2025$27.0B (+74%)$11,865M (+20%)19.2% (-90 bps)+31% / +7%24.0% (-420 bps)727 / 562$1.57, +19% ($2.31)$1,760M (106%)
Q1 2026$23.0B (+87%)$11,614M (+29%)21.8% (-200 bps)+39% / +20%26.4% (-230 bps)640 / 520$1.86, +25% ($1.83)$1,658M (84%)
Q2 2026$16.5B (+17%)$12,634M (+24%)21.7% (-130 bps)+26% / +30%27.3% (-160 bps)659 / 510$2.02, +22% ($2.30)$3,027M (143%)
What changed

Operating margin has been below the prior year for three quarters running, while services growth peaked at 39% in Q1. Equipment growth swung from 7% to 30% as the spare-engine ratio and customer mix moved.

Units

Q4 2025 units are the 10-K full year less nine months. LEAP units were 520 in Q1 and 510 in Q2, below Q4 2025's 562; the year-on-year growth is real, the sequential ramp is uneven.

Bases

From Q1 2026 the Aeroderivative business moved from CES to DPT and some Technology & Operations costs moved from Corporate into the segments. The Q3 and Q4 2025 segment figures here are on the old basis; 2026 releases recast the 2025 comparisons.

GAAP dip in Q1

Q1 GAAP profit fell 2% while operating profit rose 18%, mainly a $309M unrealized loss on the BETA Technologies investment (Q1 10-Q); Q2 had a $47M gain on it.

Guidance: held in April, raised in July

FY2026 guidance, January to July, and FY2025 against its October guide

MeasureFY2025 actualJan 22, 2026Apr 21, 2026Jul 16, 2026Implied H2 2026 (our arithmetic)
Adjusted revenue growth+21% ($42.3B)Low double digitsHeld; trending to high endHigh teensn/a
Operating profit$9.1B (21.4%)$9.85-10.25BHeld$10.55-10.75B$5.28-5.48B against $4.57B
Adjusted EPS$6.37$7.10-7.40Held$7.65-7.85$3.77-3.97 against $3.23
FCF$7.7B (113%)$8.0-8.4BHeld$8.9-9.2B$4.2-4.5B against $4.1B
CES revenue / profit$31.9B / $8.6B (recast)Mid-teens / $9.6-9.9BHeld~20% / $10.25-10.35Bn/a
DPT revenue / profit$12.2B / $1.5B (recast)MSD-HSD / $1.55-1.65BHeldLow double digits / $1.6-1.7Bn/a
FY2025 record

October 2025 raised FY2025 to adjusted EPS $6.00-6.20, operating profit $8.65-8.85B and FCF $7.1-7.3B; the year landed at $6.37, $9.1B and $7.7B, above every raised range.

Reading July

The new adjusted EPS floor ($7.65) is above January's ceiling ($7.40). The implied second half is our subtraction of reported first-half figures: earnings growth stays near 17-23%, but FCF growth slows to about 2-10% after a first half helped by allowances.

April assumptions

April's hold assumed elevated Brent crude through Q3, a near-term fuel-availability effect, lower global GDP and flat to low-single-digit departures, and no recession.

Backlog: large, and flat in the second quarter

Remaining performance obligation (10-K and 10-Qs)

DateTotal RPOEquipmentServices
Sep 30, 2025$176.3B$25.3B$151.0B
Dec 31, 2025$190.6B$27.5B$163.0B
Mar 31, 2026$211.3B$31.4B$179.9B
Jun 30, 2026$210.8B$32.1B$178.7B
Timing

Services RPO is long-dated: 12% is expected within a year, 40% within five years and 66% within ten. Equipment RPO is nearer: 32% within a year, 54% within two.

Q2

"Over $210 billion" (Culp) is accurate, but total RPO dipped $0.5B from March, with CES RPO down from $181.1B to $179.9B while DPT rose. One quarter is not a trend.

Capital, governance and deal events

8-Ks and filings, October 2025 to October 2026

DateEventSource
Dec 2025Board authorizes up to $20B of share repurchases; $18.0B left at June 30, 2026Q2 10-Q
Jan 15, 2026Mohamed Ali named CEO of an expanded CES from February 1; Russell Stokes to retire July 318-K
May 5, 2026All nine nominees elected; say-on-pay about 96% of votes cast for or against; defense-products report proposal about 8%8-K (May 7)
Jun 8, 2026Judson Althoff elected to the board from June 248-K (Jun 11)
Sep 8, 2026Agreement to acquire CPP for $11.75B; close expected second half of 20278-K (E2)
Sep 21, 2026Althoff joins the Audit Committee; Wesley Bush becomes independent Lead Director, succeeding Tom Horton8-K (E1)
Capital returns

First-half 2026 buybacks were 14.1M shares for $4,223M and dividends paid $873M; the quarterly dividend is $0.47 against $0.36. 2025 buybacks were $7.4B.

Governance

Board changes are accountability context, not evidence about output, earnings or the deal's return.

In plain English

GAAP revenue includes the run-off insurance business; adjusted revenue removes it. GAAP profit includes insurance, equity-investment marks (such as BETA Technologies), restructuring and separation costs; operating profit removes them. Continuing EPS is GAAP; adjusted EPS removes the same items after tax and non-operating pension income. FCF is company-defined and adds back separation and restructuring cash.

Mixed signals

detected

Growth up, margin down, guidance up.

growth vs margin
On one side

Adjusted revenue +24%; operating profit +18%.

On the other

Operating margin 21.7%, down 130 bps; down year on year three quarters running.

What the pair means

Profit grows; margin quality has not kept pace.

segment mix
On one side

CES equipment +30%; engine units +26%.

On the other

CES margin 27.3% against 28.9%.

What the pair means

New engines build the future service base but dilute today's margin.

claim vs record
On one side

Record internal shop visit output (Culp).

On the other

Spare-parts delinquency up 20% sequentially (call, as the source model reports it).

What the pair means

Output and late orders can both rise when demand outruns material.

cash timing
On one side

Q2 FCF +43%, conversion about 143%.

On the other

$956M first-half allowance build; implied second-half FCF growth 2-10%.

What the pair means

Part of the cash strength is timing.

level vs change
On one side

"over $210 billion backlog" (Culp).

On the other

Total RPO $210.8B against $211.3B at March 31.

What the pair means

Backlog held after a very large Q1; it did not grow in Q2.

Conclusion

These facts reconcile through mix (more new engines), investment and inflation, and timing in cash. Keep them side by side rather than reducing them to one score.

Cash flow and earnings quality

Cash grew faster than earnings, with help from customer allowances.

Quarterly bridge
LineQ2 2025Q2 2026
Cash from operating activities, Q2$2,349M$3,258M
Gross additions to PP&E and internal-use software, Q2$(327)M$(334)M
Separation and restructuring cash added back, Q2$84M$59M
FCF (non-GAAP), Q2$2,120M$3,027M
Cash from operating activities, six months$3,891M$5,126M
Increase in sales discounts and allowances, six months$447M$956M
FCF, six months (conversion)$3,572M (106%)$4,685M (115%)
Treasury stock purchases / dividends paid, six months$(3,710)M / $(688)M$(4,527)M / $(873)M
Total borrowings at June 30 (Dec 31)$20,494M$19,157M
What the bridge shows

The 10-Q credits first-half cash to higher earnings, the allowance build (mainly on new engine installs, spare parts and, per Note 14, product durability reserves at CES) and less working-capital use. Allowances are amounts owed to customers that will be paid or credited later, so part of the cash gain is timing. The July guide implies second-half FCF only 2-10% above last year's.

Per-share effect

June liquidity was $10.3B: $9.3B of cash, equivalents and restricted cash plus $1.0B of longer time deposits; $0.4B sits in currency-controlled countries, and $1.2B of insurance cash is excluded. CPP's $11.75B, financed with $7B of cash and new debt, falls on top of buybacks and dividends that the company says will not change.

What the metrics mean

  1. 01
    Adjusted revenue

    Total revenue less run-off insurance revenue.

    Comparison ruleUse for the aerospace business; GAAP revenue also moves with insurance ($715M against $872M in Q2).

  2. 02
    Operating profit and margin

    Profit excluding insurance, U.S. tax equity, interest, non-operating pension income, restructuring, separation costs and equity-investment gains and losses, over adjusted revenue.

    Comparison ruleNot the same numerator or denominator as GAAP profit margin (21.0% in Q2).

  3. 03
    Adjusted EPS

    Continuing EPS excluding the same items after tax.

    Comparison ruleQ2 adjusted EPS ($2.02) is below continuing EPS ($2.30) because pension income and insurance profit are removed.

  4. 04
    Free cash flow and conversion

    CFOA less gross PP&E and internal-use software additions, plus dispositions, adding back separation and Corporate restructuring cash; conversion is FCF over adjusted net income.

    Comparison ruleConversion above 100% does not mean margins above 100%. Allowances and working capital move cash ahead of or behind earnings.

  5. 05
    Segment perimeter

    From Q1 2026 the Aeroderivative business moved from CES to DPT, and remaining Technology & Operations site revenue and cost moved from Corporate to the segments.

    Comparison ruleCompare 2026 segments only with recast 2025 figures; the Q3 and Q4 2025 releases use the old perimeter.

  6. 06
    Backlog (RPO)

    Unfilled, non-cancellable orders, with services valued over the expected life of the contracts.

    Comparison ruleMost services RPO is recognized over 5 to 15 years; it is not a near-term revenue forecast.

Language we flagged

Confidence language, mostly backed by numbers.

Flags are verification prompts from the results releases, the 10-Q and the CPP filings, plus call figures as the source model gives them (the transcripts were not reachable here). Not allegations. No acoustic stress, first-ever phrase use or multi-year qualifier count was measured.

“across the board”
Said Jul 16, 2026H. Lawrence Culp, Jr., Chairman and CEO · Q2 2026 release headline and statement
confidence VERIFIED
In plain English

Every company-level guide went up: revenue growth, operating profit, adjusted EPS and FCF. The phrase also headlined October 2025's raise and, in April, a hold.

What to testYear-end results on each defined measure
“record internal shop visit output”
Said Jul 16, 2026H. Lawrence Culp, Jr., Chairman and CEO · Q2 2026 release
capacity / execution WATCH
In plain English

More engines through GE's own shops; internal shop visit revenue +25%. No unit count or turnaround time is given.

What to testTurnaround times, overdue parts and on-time delivery
“time-on-wing”
Said Jul 16, 2026H. Lawrence Culp, Jr., Chairman and CEO · Q2 2026 release
customer economics / durability WATCH
In plain English

The LEAP-1B durability kit is certified and "expected" to roughly double time on wing; full cutover from the start of 2027. Longer time on wing means fewer shop visits per engine.

What to testFleet results, durability reserves and service-contract margins
“trending toward the high-end”
Said Apr 21, 2026H. Lawrence Culp, Jr., Chairman and CEO · Q1 2026 release
forecast confidence VERIFIED
In plain English

April held the ranges; July's new adjusted EPS floor ($7.65) was above April's ceiling ($7.40).

What to testWhether the July ranges are met
“including expected net synergies”
Said Sep 8, 2026Company · CPP release and presentation
deal valuation INTERPRETATION
In plain English

The 18x multiple counts about $200M of synergies GE expects to earn; without them it is about 26x.

What to testNet synergies realized after integration cost and planned investment
Speakers

Same CEO and CFO throughout.

H. Lawrence (Larry) Culp, Jr. (Chairman and CEO) is quoted in all four releases; Rahul Ghai signs as CFO on all three 10-Qs. Mohamed Ali took over CES on February 1, 2026.

Tone changes are not a change of speaker at the top.

Said vs written

Record output, margins lower.

July release: "record internal shop visit output". Same quarter's 10-Q: CES margin 27.3% against 28.9%, and "Global material availability continues to cause disruptions".

The output claim is supported; it is not a claim that supply is fixed or margins are rising.

Tone shift

Tone scoreNot scored. Qualitative comparison of the four written results releases; no call transcript was read and no counted score is given.

Qualitative reading of four checkpoints (Q3 2025 to Q2 2026) from the releases, with the 10-Qs alongside and the September CPP filings after the fourth.

Vocal tone: not analysedOriginal recordings were not listened to. Cadence, vocal stress and hesitation are not assessed.

Consistently confident, with a cautious pause in april
What shifted

The releases stay confident throughout. April is the one hold, framed by geopolitics and oil; July returns to a raise with numbers behind it. September adds a deal argument, not a call.

4 calls compared
  1. Q3 2025Oct 21, 2025Confident

    Emphasis"Exceptional quarter" · Guidance raised across the board · Material input +35%

    Our readingHigh execution confidence. [6]

  2. Q4 2025Jan 22, 2026Confident

    Emphasis"Outstanding year" · Backlog about $190B · FY2026 guide

    Our readingAnnual results above the raised guide. [7]

  3. Q1 2026Apr 21, 2026Confident qualified

    EmphasisOrders +87% · Guidance held · Geopolitical landscape

    Our readingStrong quarter, cautious outlook. [8]

  4. Q2 2026Jul 16, 2026ConfidentThis call

    EmphasisRaised across the board · Record shop visit output · Time-on-wing

    Our readingConfidence backed by first-half delivery. [9][2]

Our interpretation

This is written-language analysis of releases, not a vocal-sentiment assessment. Flagged wording is not evidence of wrongdoing.

Conclusion

Judge Q3 2026 on CES margin, overdue parts, cash without the allowance build and any CPP update.

Q&A tension

Spare-parts delinquency (Jul; as the source model reports it)

What management said

Management said spare-parts delinquency rose 20% sequentially because demand and orders kept outrunning material availability, per the source model; the transcript was not read here.

What's still open

Do overdue parts fall while shop output and deliveries keep rising?

What drove EPS (Jul; as the source model reports it)

What management said

Over 85% of the adjusted EPS increase attributed to higher operating profit, the rest to tax and share count, per the source model. The 10-Q is consistent: adjusted tax rate 16.7% against 18.7% and diluted shares 1,047M against 1,071M.

What's still open

How much of the second-half guide relies on tax and buybacks rather than operations?

CES margin

What management said

Release: margin down from install engine growth (including GE9X), investments and inflation.

What's still open

When do new-engine losses per unit fall, and does GE9X ramp keep diluting?

Middle East, oil and departures (Apr)

What management said

April's guide assumed elevated oil through Q3, a fuel-availability effect and flat to low-single-digit departures; the June 10-Q reports no material impact so far.

What's still open

Do lower airline utilization or customer credit show up in shop visits and contract profitability?

Historical outcomes

VERIFIED

FY2025 landed above the October 2025 raised guide on adjusted EPS, operating profit and FCF. FY2026 guidance was held in April and raised in July above the original ranges. The durability cutover and CPP closing are still ahead.

Oct 2025exceeded
What was signalled

FY2025 adjusted EPS $6.00-6.20, FCF $7.1-7.3B (raised).

What happened

$6.37 and $7.7B (10-K and January release).

Lesson

The raised guide was conservative.

2025met
What was signalled

Supplier material input up more than 40% in 2025.

What happened

Commercial engine units 2,386 against 1,911 (+25%); LEAP +28%.

Lesson

Supply gains showed up in deliveries.

Jan 2026raised
What was signalled

FY2026 adjusted EPS $7.10-7.40.

What happened

$7.65-7.85 in July.

Lesson

Year not complete.

Apr 2026raised
What was signalled

"Trending toward the high-end" of the ranges.

What happened

July ranges start above the old tops.

Lesson

The cautious hold was followed by a larger raise.

Jul 2026
What was signalled

LEAP-1B durability kit: about 2x time on wing, full cutover from early 2027.

What happened

No later result yet. This case is still open.

Lesson

Certification is done; fleet results are years away.

Sep 2026
What was signalled

CPP closing expected in the second half of 2027; accretive in year one; double-digit ROIC by year five.

What happened

No later result yet. This case is still open.

Lesson

After the cutoff.

BoundarySelected operating checks, not a statistical phrase study or stock-price event analysis.

Guidance, as it changed

Held once, raised once, after a year that beat its raised guide

Full year 2026; CPP's first year after an expected second-half 2027 closing only as the company describes it

FY2025
IssuedOct 21, 2025ForecastJan 22, 2026Actual
GrowthAdjusted revenue growth high teens; operating profit $8.65-8.85BAdjusted revenue $42.3B (+21%); operating profit $9.1B (21.4%); FCF $7.7B (113% conversion)
FY2026
IssuedJan 22, 2026ForecastApr 21, 2026ForecastJul 16, 2026Latest forecast
GrowthAdjusted revenue growth low double digits; operating profit $9.85-10.25B; FCF $8.0-8.4BAll ranges held, "trending toward the higher-end"; oil, fuel and departure assumptions addedAdjusted revenue growth high teens; operating profit $10.55-10.75B; FCF $8.9-9.2B (conversion above 100%)
What it means

These are management forecasts on non-GAAP bases; GE gives no GAAP EPS forecast, citing the BETA Technologies mark-to-market and other items. The July raise follows a first half that delivered over half of the original EPS range. CPP is not in the 2026 guidance and is not expected to close until the second half of 2027.

Company saga

Current chapter

A standalone engine-and-services company growing output into a record backlog. The next chapter needs equipment growth without lasting margin dilution, overdue spare parts brought down, the LEAP-1B durability kit delivered at scale from 2027 and the CPP purchase closed and integrated at a return.

The story so far
  1. Q3 2025 (October 2025)

    Adjusted revenue +26%, adjusted EPS +44%; FY2025 guidance raised "across the board"; supplier material input up more than 35%.

  2. Q4 2025 (January 2026)

    FY2025 adjusted EPS $6.37, above the raised guide; backlog "roughly $190 billion"; CES expanded under Mohamed Ali; FY2026 guide set at $7.10-7.40.

  3. Q1 2026 (April 2026)

    Orders +87%, adjusted revenue +29%; guidance held with Middle East, oil and fuel assumptions, "trending toward the high-end"; GAAP profit dipped on the BETA mark.

  4. Q2 2026 (July 2026)

    Services +26%, record internal shop visit output, margin -130 bps; guidance raised on every measure; LEAP-1B durability kit certified.

  5. After the quarter (September 2026)

    Agreement to buy CPP for $11.75B; Wesley Bush becomes independent Lead Director.

Still open

The output story has evidence in the filings. What remains open is margin as new-engine deliveries rise, the late-parts backlog, the durability programme's cost and timing, and whether CPP earns its price.

Open questions

Open questions for the next call, with the evidence that would answer each.

  1. 01Does spare-parts delinquency fall while shop output and deliveries keep rising?
  2. 02When does CES margin stop falling year on year as equipment, including GE9X, ramps?
  3. 03How much of first-half cash came from the allowance build, and how much reverses?
  4. 04What do durability reserves and the LEAP-1B kit cost, and when does fleet time on wing improve?
  5. 05Does backlog resume growth after the flat second quarter?
  6. 06What are CPP's closing conditions, financing cost and integration cost, and how are synergies measured net of investment?
  7. 07How will CPP's sales to other engine makers and defense customers be handled after closing?
  8. 08Did Q3 2026 track the July guide on operating profit, EPS and FCF?

Evidence board

ScenarioOpen

Durable services growth

Evidence so far

CES services +26% in Q2 and +32% in the first half; services RPO $178.7B.

Would weaken it

Delinquency rising; departures roughly flat; durability gains mean fewer shop visits per engine over time.

Next test

Services profit and cash growing with fewer overdue parts.

ScenarioOpen

Capacity expansion earns returns

Evidence so far

Record shop output; deliveries +26%; CPP rationale and the company's ROIC target.

Would weaken it

Margin down 130 bps; $1B U.S. investment; $11.75B deal and new debt.

Next test

Delivery and margin improve after full costs.

ScenarioOpen

Guidance delivered

Evidence so far

First-half adjusted EPS $3.88 against a $7.65-7.85 range; FY2025 beat its raised guide.

Would weaken it

Second half needs operating profit 15-20% above last year with lower margins.

Next test

Year-end results on each defined measure.

What to watch next

  • Supply

    Spare-parts delinquency, material input and shop turnaround.

  • Margins

    CES margin against equipment growth and GE9X deliveries.

  • Cash

    Q3 FCF and the change in sales discounts and allowances.

  • Backlog

    Q3 RPO against $210.8B.

  • Durability

    LEAP-1B kit cutover and durability reserves.

  • CPP

    Regulatory filings, financing and any 2027 guidance treatment.

The Cable

Briefing script (approximately 2 minutes, 241 words). No recording has been added yet.

Transcript

GE Aerospace’s latest results show strong demand turning into higher output, earnings and cash. Second-quarter adjusted revenue rose 24%, adjusted earnings per share increased 22%, and free cash flow grew 43% to approximately three billion dollars.

Management raised annual guidance. Adjusted earnings per share are now expected between seven dollars sixty-five and seven dollars eighty-five, with free cash flow of 8.9 to 9.2 billion dollars. April’s confidence near the top of the earlier range has become a formal upgrade.

The operating story is strongest in commercial services. More shop output, spare parts and engine deliveries support growth. But the recovery is not frictionless: commercial segment margin fell, and overdue spare-parts shipments increased sequentially. Record production does not mean every bottleneck is resolved.

Keep the accounting definitions straight. Adjusted revenue excludes insurance revenue, and free-cash-flow conversion uses adjusted net income. These measures are useful, but they are not interchangeable with the GAAP totals.

September added a major capital decision: an agreement to buy castings supplier CPP for 11.75 billion dollars. Management expects supply-chain benefits and first-year accretion, but closing is not expected until the second half of 2027. The lower advertised valuation multiple also depends on expected synergies.

Watch overdue parts, service-contract profitability, equipment mix and the net return on capacity investment.

The bottom line: GE Aerospace’s operating momentum is well supported. The next test is sustaining that growth while improving delivery performance and earning attractive returns on a larger capital commitment.

The Cable is Marketcable's briefing script, not a company recording. The company's original audio was not reviewed. The overdue spare-parts point comes from the July call as the source model reports it.

Primary sources

Read on Oct 15, 2026.

  1. 012025 Form 10-K, filed January 29, 2026 (F1)10-K · SEC / General Electric Company (GE Aerospace) · Jan 29, 2026Year ended December 31, 2025: the two segments, long-term service agreements, run-off insurance, risk factors, RPO of $190.6B and the capital baseline.
  2. 02Q2 2026 Form 10-Q, filed July 16, 2026 (F2)10-Q · SEC / General Electric Company (GE Aerospace) · Jul 16, 2026Six months ended June 30, 2026: unit deliveries, segment revenue split, RPO of $210.8B, cash flows, sales discounts and allowances, liquidity of $10.3B, borrowings and buybacks. Filed the same day as the results.
  3. 03Q1 2026 Form 10-Q, filed April 21, 2026 (F0)10-Q · SEC / General Electric Company (GE Aerospace) · Apr 21, 2026The preceding interim baseline: RPO of $211.3B at March 31 and the $309M BETA Technologies mark-to-market loss.
  4. 04Q3 2025 Form 10-Q, filed October 21, 2025 (FQ)10-Q · SEC / General Electric Company (GE Aerospace) · Oct 21, 2025The earlier interim record, on the segment perimeter before the 2026 recast.
  5. 052026 proxy statement (DEF 14A), filed March 12, 2026 (G)Proxy statement · SEC / General Electric Company (GE Aerospace) · Mar 12, 2026Board, ownership and executive incentives (adjusted revenue growth, operating profit, adjusted EPS and FCF are plan metrics); no compensation score is constructed.
  6. 06Q3 2025 results release, October 21, 2025 (S0)Press release · SEC / General Electric Company (GE Aerospace) · Oct 21, 2025Exhibit 99; FY2025 guidance raised to adjusted EPS $6.00-6.20 and FCF $7.1-7.3B.
  7. 07Q4 2025 results release, January 22, 2026 (S1)Press release · SEC / General Electric Company (GE Aerospace) · Jan 22, 2026Exhibit 99; FY2025 results, the first FY2026 guidance and the recast segment baseline.
  8. 08Q1 2026 results release, April 21, 2026 (S2)Press release · SEC / General Electric Company (GE Aerospace) · Apr 21, 2026Exhibit 99; guidance held, "trending toward the high-end", with oil, fuel and departure assumptions.
  9. 09Q2 2026 results release, July 16, 2026 (S3)Press release · SEC / General Electric Company (GE Aerospace) · Jul 16, 2026Exhibit 99; the latest reported quarter, the non-GAAP reconciliations and the raised FY2026 guidance.
  10. 14Q2 2026 earnings presentation, July 16, 2026 (D)Presentation · GE Aerospace · Jul 16, 2026Company slides for the July 16 call. Blocked from here; guidance and definitions were checked against the release instead.
  11. 15CPP acquisition press release, September 8, 2026 (P)Press release · GE Aerospace · Sep 8, 2026Company page blocked from here; the same release was read as Exhibit 99.2 to E2, with the investor presentation as Exhibit 99.1.
  12. 16Form 8-K of September 8, 2026: agreement to acquire CPP (E2)8-K · SEC / General Electric Company (GE Aerospace) · Sep 8, 2026Items 7.01 and 8.01: agreement to acquire Consolidated Precision Products for a cash price of $11.75B, subject to closing adjustments, expected to close in the second half of 2027 subject to regulatory approvals. Furnishes the presentation and release.
  13. 17Form 8-K of September 22, 2026: board appointments (E1)8-K · SEC / General Electric Company (GE Aerospace) · Sep 22, 2026Event of September 21: Judson Althoff to the Audit Committee; Wesley Bush independent Lead Director, succeeding Tom Horton (Lead Director since 2018), who stays on the board.
  14. 18Form 8-K of July 16, 2026: Q2 results (E3)8-K · SEC / General Electric Company (GE Aerospace) · Jul 16, 2026Item 2.02 wrapper furnishing S3; the same evidence as the release, not a second confirmation.
  15. 19Official Q2 2026 earnings webcast page (A)Webcast · GE Aerospace · Jul 16, 2026Company route to the call recording and materials; blocked from here and the recording was not reviewed.

Third-party call transcripts

Not primary sources. These come from other publishers and may contain errors.

  1. 10Q3 2025 call text, October 21, 2025 (T0)Third-party transcript · Stock Analysis (Quartr) · Oct 21, 2025Third-party copy of the call; not company-certified. Blocked from here; not read.
  2. 11Q4 2025 call text, January 22, 2026 (T1)Third-party transcript · Stock Analysis (Quartr) · Jan 22, 2026Third-party copy of the call; not company-certified. Blocked from here; not read.
  3. 12Q1 2026 call text, April 21, 2026 (T2)Third-party transcript · Stock Analysis (Quartr) · Apr 21, 2026Third-party copy of the call; not company-certified. Blocked from here; not read.
  4. 13Q2 2026 call transcript, July 16, 2026, company-hosted (O3)Third-party transcript · LSEG, hosted by GE Aerospace · Jul 16, 2026An LSEG transcript hosted on GE Aerospace's site: a third-party record, not a filing. Blocked from here; the delinquency and EPS-bridge figures attributed to it are as the source model gives them.

How this report was made

research cutoff
October 15, 2026. Latest reported quarter: Q2 2026 ended June 30, reported and filed on Form 10-Q on July 16. The September 8 CPP agreement and September 21 board changes are later events. Q3 2026 had not been reported.
which company
GE is GE Aerospace, the registrant General Electric Company (CIK 40545). GE Vernova (spun off April 2024) and GE HealthCare (spun off January 2023) are separate listed companies and are not covered here.
calls
Four checkpoints, Q3 2025 to Q2 2026 (October 21, 2025; January 22, April 21 and July 16, 2026). The third-party transcripts (T0-T2, stockanalysis.com) and the company-hosted LSEG transcript (O3) were blocked by this environment's proxy and no other copy was read, so the call rows come from the results releases and 10-Qs. The 20% rise in spare-parts delinquency and the over-85% EPS attribution are given as the source model states them and marked so.
units
Dollars are millions unless stated; EPS is dollars per diluted share. Growth is year on year unless stated.
added from the filings
Prior-year Q2 bases; the four-quarter run of orders, adjusted revenue, operating margin, CES services and equipment growth, CES margin, unit deliveries, EPS and FCF conversion; the RPO history and Q2 dip; FY2025 guidance against actuals; FY2026 segment guidance and the implied second half; the BETA Technologies marks; the allowance build and durability reserves; borrowings, buybacks and the dividend; the CPP presentation's synergy, ROIC and revenue figures; the 2026 annual-meeting votes and the CES leadership change.
corrections to the source model
  • The CPP table is headed "September 8 proposal". The 8-K reports "entry into an agreement to acquire" CPP: a signed agreement subject to regulatory approvals and closing conditions, not a proposal.
  • The source model says "installed-engine growth, including GE9X" reduced CES margin. The release says "install engine growth": new engines delivered for installation on new aircraft, which earn less than spares and services. It does not refer to the installed fleet.
  • The source model gives Q2 engine deliveries +26% and first-half total deliveries +31% without saying the bases differ. The 26% is commercial units (659 against 525); the release's 31% counts commercial and Defense & Systems units together; commercial units alone rose 37% in the first half (10-Q).
  • "Over 210" of backlog is accurate (RPO $210.8B), but the source model does not say RPO slipped from $211.3B at March 31; it did not grow in Q2.
  • The CPP price and financing are attributed to the company's press release (P), which could not be reached here; the same text is Exhibit 99.2 to the September 8 8-K (E2), with the investor presentation as Exhibit 99.1, and was read there. The Cable script is kept verbatim.
not reachable
stockanalysis.com (T0-T2) and www.geaerospace.com (O3, D, P, A) were blocked from here; each was tried once. The PDF's SEC links were all read.
audio
The original call audio was not listened to; no acoustic sentiment was assessed.
evidence status
Figures checked against the four results releases (Exhibit 99), the Q2 2026, Q1 2026 and Q3 2025 10-Qs, the 2025 10-K, the 2026 proxy, and the 8-Ks of January 15, May 7, June 11, July 16, September 8 (with Exhibits 99.1 and 99.2) and September 22.
trading signal
None. Flags are verification questions, not findings of wrongdoing or forecasts of a share-price move. No price target or scenario probability is assigned. The CPP discussion is not a view on regulatory approval.