Cerebras's Q2 2026 GAAP revenue rose 74% to $180.1M and company-defined core revenue 103% to $209.9M, led by cloud services, which nearly quadrupled.GAAP revenue fell from Q1's $193.4M as hardware deliveries dropped and $44.3M of customer-warrant amortization was deducted.The GAAP net loss was $450.5M, mostly $377.0M of stock compensation triggered by the May IPO; the core net loss was $6.9M.Remaining performance obligations were $25.4B, much of it OpenAI's.Q3 results are not yet reported.

Earnings decoder26 min readapproximately 2 minutes briefing
IPO completed May 2026

Listed during the period

Q1 2026 is a pre-IPO quarter reported after the listing. Q2 mixes six pre-IPO weeks with the first weeks as a listed company and carries one-time IPO effects: $273.6M of stock compensation on RSUs whose liquidity condition was met at the IPO, and $22.8M of related payroll tax. There is no 10-K: 2025 and 2024 figures are from the prospectus.

Earlier attempt
First S-1 filed September 30, 2024; withdrawn October 3, 2025 without being declared effective (Form RW)
This offering
New S-1 filed April 17, 2026, amended May 4 and May 11; effective May 13; Class A shares began trading May 14 on the Nasdaq Global Select Market as CBRS
Shares and price
34,500,000 Class A shares at $185.00, including the underwriters' full 4,500,000-share option; closed May 15, 2026
Proceeds
$6.4B gross (8-K); $6,232.5M net of underwriting discounts in the cash-flow statement; separately $416.7M of tax withheld on the tender offer and IPO share settlements
Voting
Class A one vote, Class B 20 votes, Class N none; the prospectus estimated Class B holders at about 99.2% of the voting power after the offering
Lock-up
Ends on the earlier of the second trading day after Q3 2026 results or 180 days after the prospectus, with early-release provisions covering up to about 171.1M shares (10-Q)

Bottom line

Mixed with watchpointsEvidence: verified

Cerebras's Q2 2026 GAAP revenue rose 74% to $180.1M and company-defined core revenue 103% to $209.9M, led by cloud services, which nearly quadrupled. GAAP revenue fell from Q1's $193.4M as hardware deliveries dropped and $44.3M of customer-warrant amortization was deducted. The GAAP net loss was $450.5M, mostly $377.0M of stock compensation triggered by the May IPO; the core net loss was $6.9M. Remaining performance obligations were $25.4B, much of it OpenAI's. Q3 results are not yet reported.

Cerebras is selling much more AI cloud capacity, and it has signed a very large, long-dated contract base, most of it with OpenAI. The proof still ahead is delivery: data centers, power and manufactured systems have to come online and be paid for. GAAP and the company's own "core" measures tell different stories this quarter, and the gap comes from real items: IPO stock awards, warrants given to customers, and pass-through data center billing. Cash on hand is large after the IPO, but operations and capital spending are not yet self-funding.

  • Reported factPositive

    GAAP revenue $180.1M against $103.3M (+74%); cloud and other services $126.0M against $33.0M (+281%); hardware $54.1M against $70.3M (-23%). Core revenue $209.9M against $103.3M (+103%), above the $194.0M Q1 outlook.

  • Two sets of numbersMixed

    GAAP gross margin 14.2%, core 40.6%. GAAP operating margin -265%, core -16%. GAAP net loss $450.5M, core net loss $6.9M. The bridge: $377.0M stock compensation, $44.3M customer-warrant amortization, $22.8M IPO payroll tax, and pass-through revenue and costs.

  • Contracted, not deliveredWatch

    Remaining performance obligations $25.4B (March 31: $25.0B), a significant amount from OpenAI's 750MW agreement; about 22% expected within 24 months, 43% in months 25-48. OpenAI revenue so far: $16.9M in Q1, $56.8M in Q2.

  • Cash and fundingMixed

    Six-month operating cash -$47.5M and capital spending $548.9M. Funded by $6.23B of IPO proceeds, $1.01B of Series H stock and a $1.0B OpenAI loan being repaid in service credits. Cash, restricted cash and investments $8.6B at June 30; $850M revolver undrawn.

Reported
  • GAAP revenue $180.1M, +74%; core revenue $209.9M, +103%.
  • Cloud and other services revenue $126.0M GAAP, $127.7M core, both nearly four times a year earlier.
  • RPO $25.4B; Customer A 34%, B 32%, C 10% of Q2 revenue; one customer 57% of receivables.
Company explanation
  • "the demand for fast inference is enormous" (Feldman, release).
  • "Our quarterly results exceeded our guidance across all core business metrics" (Komin, release).
  • Komin: the company plans "to more than triple revenue in 2027" (release; basis not stated).
Our test
  • How much contracted capacity is energized and paying each quarter.
  • GAAP revenue and margins as $1.1B of customer-warrant assets are deducted through 2031.
  • Operating cash less capital spending, and how the OpenAI loan is repaid.
Evidence boundary
  • Latest reported quarter is Q2 2026; Q3 results are not out. Only two public quarters exist, and the call transcripts and investor site could not be reached, so call wording is as the source model gives it and marked so. The audio was not reviewed. No score, rating or price view is given.

Periods compared

Matched quarter
Quarters ended June 30, 2026 and June 30, 2025; the only two public calls, Q1 2026 (June 23) and Q2 2026 (August 12). Q3 2026 results are not yet reported.
Annual context
No 10-K yet: the audited 2025 and 2024 statements come from the May 2026 IPO prospectus.
Forecast period
Q3 2026 and full-year 2026, given in the August 12 release on Cerebras's non-GAAP "core" basis; the 2027 ambition is a CFO statement in the same release

What changed

GAAP and "core" are two different perimeters.

Four quarters: cloud up, hardware lumpy, GAAP and core apart

Prospectus (Q3 and Q4 2025), results releases and 10-Qs (Q1 and Q2 2026)

QuarterGAAP revenueCore revenueHardware / cloud (GAAP)Gross margin GAAP / coreOperating loss GAAP / coreNet income (loss) GAAPOperating cash / capital spending
Q3 2025$135.7Mn/a$96.8M / $38.9M40.6% / n/a$(26.5)M / n/a$(22.2)Mnot disclosed
Q4 2025$171.4Mn/a$121.7M / $49.8M41.0% / n/a$(33.7)M / n/a$(25.6)Mnot disclosed
Q1 2026$193.4M (+94%)$191.3M (+92%)$110.6M / $82.8M44.6% / 46.5%$(15.0)M / $(3.5)M$(14.0)M+$12.3M / $132.0M
Q2 2026$180.1M (+74%)$209.9M (+103%)$54.1M / $126.0M14.2% / 40.6%$(477.2)M / $(33.6)M$(450.5)M-$59.8M / $416.9M (derived)
Before the core measure

Before 2026 there was no warrant amortization or pass-through revenue, so GAAP is the only basis. The prospectus's own non-GAAP operating loss for 2025 was $(96.1)M on a different definition.

Why GAAP fell in Q2

Hardware revenue fell from $110.6M to $54.1M, and warrant amortization deducted from revenue rose from $2.1M to $44.3M. Core hardware also fell, from $111.6M to $82.1M, so hardware timing, not only accounting, explains the dip.

Derived quarters

Q2 operating cash and capital spending are six-month figures less Q1. The prospectus does not give quarterly cash flow for 2025.

Q2 bridge from GAAP to core

Q2 2026, results release reconciliations

ItemRevenueGross profitOperating lossNet loss
GAAP$180.1M$25.6M$(477.2)M$(450.5)M
Less pass-through revenue$(14.5)M$(14.5)M$(14.5)M$(14.5)M
Add pass-through costs$14.1M$14.1M$14.1M
Add customer-warrant amortization$44.3M$44.3M$44.3M$44.3M
Add stock compensation$15.4M$377.0M$377.0M
Add IPO payroll tax on stock compensation$0.5M$22.8M$22.8M
Core$209.9M$85.2M$(33.6)M$(6.9)M
Not all non-cash

Stock compensation and warrants do not use cash, but they dilute shareholders. The $22.8M payroll tax is cash. Pass-through billing is real revenue and cost at close to zero margin.

Core net loss and interest

Core net loss ($6.9M) is smaller than the core operating loss ($33.6M) because other income was $27.0M: interest and dividend income on the IPO cash, net of $19.7M of non-cash interest on the OpenAI loan.

The OpenAI agreement and the backlog

10-Qs for Q1 and Q2 2026

ItemCompany recordSource
Committed capacity750MW, deployment in tranches during 2026-2028; term three or four years, extendable to fiveF2
OptionAdditional 1.25GW by the end of 2030, up to 2.0GW in totalF2
Revenue recognized$16.9M in Q1, $56.8M in Q2, net of warrant amortizationF0, F2
RPO, March 31 / June 30$25.0B (16% within 24 months) / $25.4B (22% within 24 months; 43% in months 25-48)F0, F2
Working capital loanAbout $1.0B received January 2026; 6% stated interest; $918.2M outstanding at June 30 after $86.3M of non-cash service credits; no cash repaidF2
OpenAI warrantUp to 33,445,026 Class N shares at $0.00001, vesting on funding, capacity delivery and market-value or payment milestones; 10,033,508 shares exercised in July 2026F2
Customer concentration, Q2Customer A 34%, B 32%, C 10% of revenue; Customer B 57% of receivablesF2
What RPO includes

Pass-through data center costs are in RPO only for sites already leased; those for capacity not yet leased are excluded. So RPO is neither core revenue nor gross profit.

Labels move

The anonymized customer letters are reassigned between filings (in Q1, Customer A was 63% of revenue). Marketcable does not match letters to names.

Funding the build-out

Six months to June 30, 2026, cash-flow statement and 10-Q

ItemAmountSource
IPO proceeds, net of underwriting$6,232.5MF2
Series H preferred stock (February)$1,014.2MF2
OpenAI working capital loan (January)$1,004.6M, held as restricted cash for the build-outF2
Tax withheld on tender offer and IPO share settlements$(416.7)MF2
Revolving credit facility$250M from April 14 (letters of credit only), upsized to $850M on June 17; undrawn at June 30F2
Data center leases signed after June 30About $753.4M of undiscounted future payments, starting in 2026F2
Liquidity

The release's $8.6B is cash ($6,742M), restricted cash ($685M) and investments ($1,179M). The undrawn revolver is borrowing capacity, not cash.

In plain English

Core revenue is GAAP revenue less pass-through data center billing plus the customer-warrant amortization that GAAP deducts from revenue. Core margins and losses also remove stock compensation and IPO payroll tax, and core net loss removes the 2025 forward-contract gain. Both the top line and the costs change, so core margins cannot be compared with another company's GAAP margins.

Mixed signals

detected

Strong year-on-year growth, a weaker quarter-on-quarter picture.

core vs GAAP
On one side

Core revenue +103% year on year, above the Q1 outlook.

On the other

GAAP revenue down 7% from Q1.

What the pair means

Hardware deliveries fell and warrant amortization rose; cloud grew 52% on the quarter.

year on year vs sequential
On one side

Core gross margin up 9.4 points year on year.

On the other

Down 5.9 points from Q1's 46.5%, and guided to 38-40% for Q3.

What the pair means

Start-up costs of new capacity arrive before its revenue.

backlog vs near term revenue
On one side

RPO $25.4B.

On the other

RPO up only $0.4B in the quarter; about 78% falls more than two years out.

What the pair means

The backlog is mostly one long contract, not a stream of new orders.

adjusted vs cash
On one side

Core net loss $6.9M.

On the other

GAAP net loss $450.5M; operating cash less capital spending -$476.7M in the quarter.

What the pair means

Interest on IPO cash and excluded items narrow the core loss; cash needs are driven by capital spending.

Conclusion

Year-on-year comparisons are flattered by a small 2025 base; sequential numbers show hardware timing and margin pressure from building capacity. Keep both in view.

Cash flow and earnings quality

IPO cash funds a build-out that operations do not yet pay for.

Quarterly bridge
LineQ2 2025Q2 2026
Operating cash flow, Q2 (derived)$(68.9)M$(59.8)M
Purchases of property and equipment, Q2 (derived)$(86.9)M$(416.9)M
Operating cash flow less capital spending, Q2 (our arithmetic)$(155.8)M$(476.7)M
Operating cash flow, six months$(123.8)M$(47.5)M
Purchases of property and equipment, six months$(185.1)M$(548.9)M
Operating cash flow less capital spending, six months (our arithmetic)$(308.9)M$(596.4)M
Customer deposits, change in six months$(320.6)M$(111.8)M
Deferred revenue, change in six months$16.5M$126.4M
Financing inflow, six months$5.1M$7,853.2M
What the bridge shows

Six-month operating cash was close to break-even only because $559.5M of non-cash charges, mainly stock compensation, offset the net loss. Capital spending, mainly systems for Cerebras Cloud, nearly tripled. The OpenAI loan is repaid in service credits, so some future OpenAI revenue will reduce the loan rather than bring in cash ($86.3M credited by June 30).

Per-share effect

No dividends or buybacks. Dilution comes from IPO shares, stock awards and customer warrants (OpenAI up to 33.4M Class N shares, AWS up to 2.7M at $100.00, G42 1.66M exercised in April).

Annual context

FY2025 vs FY2024 (audited, IPO prospectus)

LinePriorCurrentChange
Total revenue$290.3M$510.0M+76%
Gross margin42.3%39.0%-3.3 pts
Loss from operations$(101.4)M$(145.9)M
Net income (loss)$(481.6)M$237.8M
Operating cash flow$452.0M$(10.1)M
Why the year looks this way

No annual report on Form 10-K exists yet; the first will cover 2026. These audited figures are the baseline.

What the metrics mean

  1. 01
    Core revenue

    GAAP revenue less pass-through data center revenue, plus customer-warrant amortization recorded as a revenue reduction.

    Comparison ruleEqual to GAAP revenue before 2026; from Q1 2026 compare core with core and GAAP with GAAP. The adjustment grew from $2.1M of amortization in Q1 to $44.3M in Q2.

  2. 02
    Customer-warrant amortization

    The value of warrants issued to OpenAI, AWS and G42, held as an asset and deducted from revenue as related revenue is recognized.

    Comparison rule$1.1B was still to be deducted at June 30, through October 2031, so GAAP revenue will keep running below core.

  3. 03
    Pass-through revenue

    Data center start-up and recurring costs billed on to specific customers at close to zero margin, reported gross.

    Comparison ruleInside GAAP revenue ($14.5M in Q2) but outside core; it will rise with OpenAI deployments and can move GAAP margins without changing core.

  4. 04
    Remaining performance obligations

    Contracted revenue not yet recognized, including deferred revenue; pass-through costs only for sites already leased.

    Comparison ruleNot a forecast of revenue in any one year; the company says timing can change at the customer's request.

  5. 05
    Data center capacity (MW)

    Capacity "live and under contract for delivery by the end of 2027", more than 600MW at August 12.

    Comparison ruleNot energized, utilized or revenue-generating capacity; no split between live and contracted is given.

  6. 06
    Core gross and operating margin

    Core gross profit or operating loss over core revenue, excluding stock compensation, IPO payroll tax, warrant amortization and pass-through items.

    Comparison ruleDifferent numerator and denominator from GAAP; the prospectus's 2025 non-GAAP operating loss used an earlier definition.

Language we flagged

Very confident on demand, careful on definitions.

Flags are verification prompts from the two results releases, the 10-Qs and the prospectus, plus call phrases as the source model gives them (the transcripts were not reachable here). Not allegations. No acoustic stress, first-ever phrase use or multi-year count is possible with two public quarters.

“the demand for fast inference is enormous”
Said Aug 12, 2026Andrew Feldman, CEO · Q2 2026 release
demand confidence WATCH
In plain English

A statement of confidence, not a booked-dollar figure; the filed measures are RPO and revenue.

What to testCloud revenue growth by quarterNew RPO beyond the OpenAI agreement
“live and under contract for delivery by the end of 2027”
Said Aug 12, 2026Company · Q2 2026 release, on more than 600MW
capacity INTERPRETATION
In plain English

Combines operating capacity with capacity still to be delivered; the headline shortens it to "under contract".

What to testLive megawatts disclosed separatelyProperty and lease additions each quarter
“plan to more than triple revenue in 2027”
Said Aug 12, 2026Bob Komin, CFO · Q2 2026 release
forward ambition WATCH
In plain English

A plan, not guidance; the release does not say whether it means GAAP or core revenue.

What to test2027 outlook with a stated basisQuarterly core revenue run rate in 2027
“core”
Said Aug 12, 2026Company · Both releases; reconciliations to GAAP
accounting perimeter VERIFIED
In plain English

Company-defined measures that exclude pass-through items, warrant amortization and stock compensation; reconciled in the release.

What to testSize of the GAAP-to-core gap each quarterWarrant asset balance
“exceeded our guidance across all core business metrics”
Said Aug 12, 2026Bob Komin, CFO · Q2 2026 release
delivery claim VERIFIED
In plain English

True against the June core outlook for revenue, gross margin and operating margin.

What to testQ3 against $214M-$216M and the margin bands
“largest semiconductor IPO of all time”
Said Jun 23, 2026Company · Q1 2026 release headline
superlative INTERPRETATION
In plain English

A ranking claim the filings do not support or test; the filed fact is $6.4B gross proceeds.

What to testNone in the filings
Speakers

Same CEO and CFO in both quarters.

Andrew Feldman (co-founder, CEO) and Bob Komin (CFO) are quoted in both releases.

The shift in emphasis is not a change of speaker.

Said vs written

"Exceeded our guidance" is true on the core basis.

Core revenue $209.9M against about $194.0M guided; core gross margin 40.6% against 36-38%; core operating margin (16)% against (30)% to (32)%.

No GAAP guidance was given, so the GAAP loss cannot be judged against a forecast.

Tone shift

Tone scoreNot scored. Qualitative comparison of the two written results releases; no call transcript was read and two observations are too few for a trend.

Qualitative reading of the CEO and CFO statements and highlights in the June and August releases, with the 10-Qs alongside.

Vocal tone: not analysedOriginal recordings were not listened to. Cadence, vocal stress and hesitation are not assessed.

From introducing the opportunity to counting capacity
What shifted

The June release talks about speed, customers and funding; the word "capacity" does not appear in its narrative. The August release uses it eleven times, adds manufacturing and supply-chain sections and a 2027 plan. Confidence is high in both, so no change in sentiment is established.

2 calls compared
  1. Q1 2026Jun 23, 2026Confident

    EmphasisOutstanding start · Speed · OpenAI and AWS · IPO

    Our readingIntroduces the public story: fast AI is more valuable, large customers have signed. [4][3]

  2. Q2 2026Aug 12, 2026ConfidentThis call

    EmphasisEnormous demand · 600MW · Manufacturing 10x · Triple in 2027

    Our readingQuantifies capacity and future scale; beats its own core outlook. [5][2]

Our interpretation

This is written-language analysis of two releases, not a vocal-sentiment assessment, and two data points are a weak baseline. Flagged wording is not evidence of wrongdoing.

Conclusion

Judge Q3 on core revenue against $214M-$216M, core margins against the bands, GAAP revenue after warrant amortization, and any disclosure of live versus contracted megawatts.

Q&A tension

Data center availability (August call; as the source model reports it)

What management said

Management acknowledged data center availability as a bottleneck while describing demand as very strong.

What's still open

How much of the more than 600MW is live today, and when does each tranche begin billing?

2027 growth (August call; as the source model reports it)

What management said

The CFO described a plan to more than triple core revenue in 2027, alongside capacity expansion.

What's still open

On which basis, core or GAAP, and how much depends on OpenAI's committed tranches?

Historical outcomes

VERIFIED

One forecast cycle can be checked: the June outlook for Q2 was beaten on core revenue, gross margin and operating margin, and the full-year range was raised. The OpenAI agreement has started producing revenue. The Q3, full-year and 2027 statements are unresolved.

Jun 2026met
What was signalled

Q2 core revenue about $194.0M.

What happened

Core revenue $209.9M (release).

Lesson

About 8% above the outlook; one cycle is not a beat rate.

Jun 2026met
What was signalled

Q2 core gross margin 36-38%, core operating margin (30)% to (32)%.

What happened

40.6% and (16)%.

Lesson

Both well above the bands; core gross margin still fell from Q1's 46.5%.

Dec 2025partly
What was signalled

OpenAI committed to 750MW, deployed in tranches during 2026-2028 (10-Q).

What happened

OpenAI revenue $16.9M in Q1 and $56.8M in Q2; RPO $25.4B.

Lesson

Delivery has begun; most of the contract is due after mid-2028.

Jun 2026
What was signalled

FY2026 core revenue $855M-$865M.

What happened

No later result yet. This case is still open.

Lesson

Raised to $880M-$890M in August; the year is not yet reported.

Aug 2026
What was signalled

Q3 core revenue $214M-$216M; plan to more than triple revenue in 2027.

What happened

No later result yet. This case is still open.

Lesson

Q3 results not yet reported at the cutoff.

BoundarySelected operating checks from a two-quarter public record, not a statistical phrase study or stock-price event analysis.

Guidance, as it changed

Core only, and back-loaded

Q3 2026 and full-year 2026, given in the August 12 release on Cerebras's non-GAAP "core" basis; the 2027 ambition is a CFO statement in the same release

FY2025
IssuedMay 14, 2026Actual
GrowthRevenue $510.0M, +76%; GAAP gross margin 39.0% (prospectus)
Q2 2026
IssuedJun 23, 2026ForecastAug 12, 2026Actual
GrowthCore revenue about $194.0M (+88%); core gross margin 36-38%; core operating margin (30)% to (32)%Core revenue $209.9M (+103%); core gross margin 40.6%; core operating margin (16)%
FY2026
IssuedJun 23, 2026ForecastAug 12, 2026Latest forecast
GrowthCore revenue $855M-$865M (+69% at the midpoint); core gross margin 38-41%; core operating margin (28)% to (32)%Raised: core revenue $880M-$890M; core gross margin 41-43%; core operating margin (19)% to (17)%
Q3 2026
IssuedAug 12, 2026Latest forecast
GrowthCore revenue about $214M-$216M; core gross margin 38-40%; core operating margin (25)% to (23)%
2027
IssuedAug 12, 2026Forward looking
GrowthNo range; CFO: "plan to more than triple revenue in 2027" (release; the source model reports it as core revenue)
What it means

All guidance is on the non-GAAP core basis, with no GAAP reconciliation offered. The raised year implies about $263M-$275M of core revenue in Q4 after Q3's $214M-$216M (our arithmetic), and, at the midpoints, a Q4 core operating margin of about (26)%, in line with Q3's band (our arithmetic).

Company saga

Current chapter

A wafer-scale chip maker turning from selling systems to a few large buyers into running an inference cloud on contracted data center capacity, funded by a $6.4B IPO and anchored by a multi-year OpenAI agreement that comes with a loan and a warrant.

The story so far
  1. 2024-2025

    First S-1 filed September 2024 and withdrawn October 3, 2025. Revenue $290.3M in 2024 and $510.0M in 2025; MBZUAI 62% and G42 24% of 2025 revenue (G42 85% in 2024); cloud inference grows in the second half of 2025.

  2. December 2025 - February 2026

    OpenAI agreement for 750MW, with a $1.0B working capital loan (funded January) and a warrant for up to 33.4M shares; $1.0B Series H round in February.

  3. Q1 2026 (reported June 2026)

    GAAP revenue $193.4M, core $191.3M; AWS partnership; first core outlook. IPO priced May 13 at $185.00, $6.4B gross, closed May 15.

  4. Q2 2026 (August 2026)

    Core revenue $209.9M; GAAP net loss $450.5M on IPO stock compensation; RPO $25.4B; more than 600MW live or contracted; AMD and AWS disaggregated-inference plans; full-year outlook raised.

  5. After the quarter

    July: OpenAI exercised 10.0M warrant shares. Q3: about $753.4M of new data center lease commitments (10-Q subsequent events). Form 144 notices of proposed insider sales filed from August 14 (EDGAR index); the lock-up ends around Q3 results.

Still open

Demand and funding are on the record. Still open: how fast contracted megawatts become paying capacity, whether core margins hold as capacity is stood up ahead of revenue, how much of GAAP revenue the warrant assets will absorb, and whether customers beyond OpenAI and the G42 group grow into a broad base.

Open questions

Open questions for the next call, with the evidence that would answer each.

  1. 01Did Q3 core revenue land within $214M-$216M, and core margins within the bands? Q3 release and reconciliations.
  2. 02How many of the more than 600 megawatts are live and billing today? Any split of live and contracted capacity, and property and lease additions.
  3. 03How much GAAP revenue will warrant amortization remove each quarter as OpenAI tranches deliver? The warrant asset roll-forward in the 10-Q.
  4. 04Is the 2027 plan to more than triple revenue stated on a core or GAAP basis, and how much of it is OpenAI? The Q3 and Q4 outlooks.
  5. 05How much of the working capital loan is repaid in service credits each quarter, and what cash does OpenAI usage bring in? The debt note.
  6. 06Does revenue concentration fall as AWS leases commence and coding customers ramp? The significant-customers table.
  7. 07How much more capital spending and lease commitment does the 2027 capacity need, and is the revolver drawn? Cash-flow statement and commitments note.
  8. 08What happens to share supply when the lock-up ends after Q3 results? Form 4 and 144 filings.

Evidence board

ScenarioOpen

Contracted capacity becomes paying capacity

Evidence so far

RPO $25.4B; cloud revenue $126.0M, nearly four times a year earlier; OpenAI revenue up from $16.9M to $56.8M.

Would weaken it

Only about 22% of RPO is due within 24 months; core gross margin fell on the quarter; no live-megawatt figure.

Next test

Cloud revenue and core gross margin as tranches go live.

ScenarioOpen

Core measures describe the economics

Evidence so far

Full reconciliations in each release; core net loss $6.9M.

Would weaken it

$1.1B of warrant assets still to come off GAAP revenue; $377.0M of quarterly stock compensation; dilution from warrants.

Next test

GAAP and core moving closer as one-time IPO items pass.

ScenarioOpen

A broader customer base

Evidence so far

New agreements with AWS, Cognition, Lovable and others named in the release.

Would weaken it

Three customers 76% of Q2 revenue; one 57% of receivables; AWS leases not yet commenced.

Next test

Concentration table in the Q3 10-Q.

What to watch next

  • Guidance

    Q3 core revenue and margins against the August bands; first 2027 outlook and its basis.

  • Capacity

    Live versus contracted megawatts; capital spending and new leases.

  • GAAP vs core

    Warrant amortization, pass-through revenue and stock compensation each quarter.

  • OpenAI

    Revenue under the agreement, loan credits, further warrant vesting and exercises.

  • Concentration

    Customer shares of revenue and receivables; AWS lease commencement.

  • Ownership

    Lock-up expiry after Q3 results; insider Form 4 and 144 filings.

The Cable

Briefing script (approximately 2 minutes, 246 words). No recording has been added yet.

Transcript

Cerebras Systems, ticker CBRS, is a newly public AI infrastructure company with strong cloud growth and a large execution task ahead. Second-quarter GAAP revenue grew 74% to 180 million dollars. Company-defined core revenue grew 103% to 210 million.

The distinction matters. Core revenue adds back customer-warrant amortization and removes specified data-center pass-through billing. Core margins also exclude stock compensation and other items. The company reported a large GAAP loss and a much smaller core loss. Neither the adjustments nor the IPO funding prove the business is already self-funding.

Management reports 25.4 billion dollars of remaining performance obligations, with a significant share tied to OpenAI. That is long-dated contracted work, not current cash or profit. The contract also involves customer warrants and a working-capital loan repaid through service credits.

Capacity is the central delivery test. More than 600 megawatts are live or contracted for delivery by the end of 2027. That does not mean all the capacity is operating today. Manufacturing expansion, power, installed systems and paying usage must come together.

Cerebras raised its annual core-revenue outlook and expects to more than triple core revenue in 2027. Those ambitions require substantial investment and remain forecasts.

Because the company listed in May, only two public earnings calls are available in this review. Its IPO prospectus supplies the audited annual baseline.

The bottom line: Cerebras has credible commercial traction. The next proof is delivering concentrated contractual demand at a durable cash return, with dilution and financing effects fully visible.

The Cable is Marketcable's briefing script, not a company recording. The company's original audio was not reviewed.

Primary sources

Read on Oct 15, 2026.

  1. 01IPO prospectus (Form 424B4), filed May 14, 2026 (F1)SEC / Cerebras Systems Inc. · May 14, 2026Audited 2025 and 2024 statements, quarterly results to December 2025, business, risks and the three-class voting structure. The annual baseline in place of a 10-K, which Cerebras has not yet filed.
  2. 02Q2 2026 Form 10-Q, filed August 12, 2026 (F2)10-Q · SEC / Cerebras Systems Inc. · Aug 12, 2026Six months ended June 30, 2026: revenue note, customer concentration, OpenAI agreement, remaining performance obligations, working capital loan, revolving credit, customer warrants, stock compensation, lock-up, subsequent events.
  3. 03Q1 2026 Form 10-Q, filed June 24, 2026 (F0)10-Q · SEC / Cerebras Systems Inc. · Jun 24, 2026The first public interim filing: RPO of $25.0B at March 31, Q1 cash flows and concentration.
  4. 04Q1 2026 results release, June 23, 2026 (S0)Press release · SEC / Cerebras Systems Inc. · Jun 23, 2026Exhibit 99.1; GAAP revenue $193.4M, core revenue $191.3M; first Q2 and full-year 2026 core outlook.
  5. 05Q2 2026 results release, August 12, 2026 (S3)Press release · SEC / Cerebras Systems Inc. · Aug 12, 2026Exhibit 99.1; the latest reported quarter: GAAP revenue $180.1M, core revenue $209.9M, GAAP-to-core reconciliations, Q3 and raised full-year core outlook.
  6. 08Form 8-K filed August 12, 2026: Q2 results (E1)8-K · SEC / Cerebras Systems Inc. · Aug 12, 2026Items 2.02 and 9.01; furnishes the Q2 release.
  7. 09Form 8-K filed June 23, 2026: Q1 results (E2)8-K · SEC / Cerebras Systems Inc. · Jun 23, 2026Items 2.02 and 9.01; furnishes the first public results release.
  8. 10Form 8-K filed May 15, 2026: IPO closing (E3)8-K · SEC / Cerebras Systems Inc. · May 15, 2026Items 5.03, 8.01 and 9.01: 34,500,000 Class A shares sold at $185.00, including the full 4,500,000-share option; $6.4B gross; restated charter and bylaws.
  9. 11Official investor route (A)Webcast · Cerebras Systems Inc. · Aug 12, 2026Company route to the webcasts and replays; not reachable from here and the recordings were not reviewed.
  10. 12Form S-1 registration statement, filed April 17, 2026SEC / Cerebras Systems Inc. · Apr 17, 2026The registration statement for the May 2026 offering; amended May 4 and May 11, declared effective May 13.
  11. 13Withdrawal of the 2024 S-1 (Form RW), October 3, 2025SEC / Cerebras Systems Inc. · Oct 3, 2025Cerebras withdrew the S-1 first filed September 30, 2024, saying it did not intend to conduct that offering "at this time"; never declared effective, no shares sold.

Third-party call transcripts

Not primary sources. These come from other publishers and may contain errors.

  1. 06Q1 2026 call text, June 23, 2026 (T0)Third-party transcript · Stock Analysis (Quartr) · Jun 23, 2026Third-party copy of the call; not company-certified. Not reachable from here; not read.
  2. 07Q2 2026 call text, August 12, 2026 (T3)Third-party transcript · Stock Analysis (Quartr) · Aug 12, 2026Third-party copy of the call; not company-certified. Not reachable from here; not read.

How this report was made

research cutoff
October 15, 2026. Latest reported quarter: Q2 2026 ended June 30, reported August 12 with the 10-Q filed the same day. No 8-K has been filed since; Q3 results are not yet reported.
short public history
Cerebras listed in May 2026, so there are two public quarters and two calls (June 23 and August 12, 2026), not four. Q3 and Q4 2025 come from the prospectus's unaudited quarterly table; the 2025 and 2024 years are audited figures from the prospectus, in place of a 10-K.
calls
The third-party transcripts (T0, T3, stockanalysis.com) and the investor site (A) were blocked by this environment's proxy, so the call rows come from the results releases, 10-Qs and prospectus. Q&A topics and the core basis of the 2027 statement are as the source model states them and marked so.
units
Dollars in millions unless stated; EPS in dollars per share. Core figures are the company's non-GAAP measures from its reconciliations. Q2 operating cash and capital spending are derived from the six-month and three-month statements; margins and operating cash less capital spending are our arithmetic.
added from the filings
Prior-year bases; the quarterly run from Q3 2025; hardware against cloud on both bases; RPO at March 31 ($25.0B, 16% within 24 months); OpenAI revenue by quarter; the working capital loan balance ($918.2M), credits ($86.3M) and non-cash interest; the OpenAI, AWS and G42 warrants and the $1.1B warrant asset; IPO stock compensation ($273.6M on RSUs); the $416.7M tax withholding; the revolver's upsizing from $250M to $850M; $753.4M of post-quarter leases; the 20-vote Class B shares; the lock-up; the withdrawn 2024 S-1.
corrections to the source model
  • The model reads the 2027 statement as a plan to more than triple core revenue. The release quotes the CFO as planning "to more than triple revenue in 2027" without naming a basis; the core reading is the model's account of the call, which could not be read here. Both are shown, labelled.
  • The model attributes the sequential fall in GAAP revenue to warrant amortization and pass-through treatment. Those explain part of it (amortization rose from $2.1M to $44.3M), but hardware revenue also fell on both bases: GAAP from $110.6M to $54.1M, core from $111.6M to $82.1M. Added.
  • The model describes "core margin progress". That holds year on year (+9.4 points), but core gross margin fell from 46.5% in Q1 to 40.6% in Q2, and core operating margin from (2)% to (16)%. Added.
  • The model scores the Q1 outlook as one favorable checkpoint on revenue. The June outlook also gave Q2 margin bands (core gross 36-38%, core operating (30)% to (32)%), which were beaten (40.6%, (16)%). Added.
  • The model gives RPO of $25.4B without the prior quarter. The Q1 10-Q reports $25.0B at March 31, with 16% due within 24 months, so RPO rose $0.4B and the near-term share rose as time passed. Added.
  • The model gives first-half financing as IPO proceeds and the OpenAI loan. The cash-flow statement also shows $1,014.2M of Series H preferred stock and $416.7M of tax withheld on the tender offer and IPO share settlements. Added.
  • The model mentions customer warrants and dilution without amounts. The 10-Q shows an OpenAI warrant for up to 33,445,026 Class N shares at $0.00001 (10,033,508 exercised in July 2026), an AWS warrant for up to 2,696,678 shares at $100.00, and $1.1B of warrant assets to be deducted from revenue through October 2031. Added.
  • The model refers to multi-class governance without detail. The prospectus gives Class B shares 20 votes each and estimates Class B holders at about 99.2% of the voting power after the offering. Added, with the lock-up terms and the October 2025 withdrawal of the first S-1. The Cable script is kept verbatim, including its "core revenue" reading of the 2027 plan.
not reachable
stockanalysis.com (T0, T3) and investors.cerebras.ai (A) were blocked by this environment's proxy. The www.sec.gov filings were read, and data.sec.gov responded.
audio
The original call audio was not listened to; no acoustic sentiment was assessed.
evidence status
Figures checked against the Q1 and Q2 2026 results releases (Exhibit 99.1), the Q1 and Q2 2026 10-Qs, the IPO prospectus (424B4), the 8-Ks of May 15, June 23 and August 12, 2026, and the October 3, 2025 Form RW.
trading signal
None. Flags are verification questions, not findings of wrongdoing or forecasts of a share-price move. No price target or scenario probability is assigned.