JOBY Joby Aviation, Inc.
Export CSV ↓Dropped topic
Insufficient history. 1 instance, below the minimum of 5, so no summary counts are shown.
“TIA flight testing”
Shareholder letter, authors not named
Q4 2025 shareholder letter, Feb. 25, 2026 (J1)Q1 2026 shareholder letter, May 5, 2026 (J2)Q2 2026 shareholder letter, Aug. 5, 2026 (J3)
Reaction windows (JOBY-2026-08-05): not provided yet.
Items to check
- Not mentioned in the Aug. letter; FAA pilots expected to fly "later this year" (Feb.).
Exclusion
Insufficient history. 1 instance, below the minimum of 5, so no summary counts are shown.
“H1 cash use guide "excluding" Ohio”
Shareholder letter, authors not named
Q4 2025 shareholder letter, Feb. 25, 2026 (J1)Q1 2026 shareholder letter, May 5, 2026 (J2)Q2 2026 shareholder letter, Aug. 5, 2026 (J3)
Reaction windows (JOBY-2026-05-05): not provided yet.
Items to check
- Including the $32M net Ohio purchase, H1 cash use was $397M (calculated).
Guide vs run rate
Insufficient history. 1 instance, below the minimum of 5, so no summary counts are shown.
“We are increasing our full year 2026 total revenue outlook”
Shareholder letter, authors not named
Q2 2026 shareholder letter, Aug. 5, 2026 (J3)
Reaction windows (JOBY-2026-08-05): not provided yet.
Items to check
- Second-half revenue implied by the range averages $26.1M to $31.1M per quarter (calculated), below Q2's $38.6M.
Repeated status
Insufficient history. 2 instances, below the minimum of 5, so no summary counts are shown.
“Stage 2 "essentially complete"”
Shareholder letter, authors not named
Q4 2025 shareholder letter, Feb. 25, 2026 (J1)Q1 2026 shareholder letter, May 5, 2026 (J2)Q2 2026 shareholder letter, Aug. 5, 2026 (J3)
Reaction windows (JOBY-2026-08-05): not provided yet.
“Second vertiport "nearing completion" / "nearly complete"”
Shareholder letter, authors not named
Q1 2026 shareholder letter, May 5, 2026 (J2)Q2 2026 shareholder letter, Aug. 5, 2026 (J3)Q2 2026 results release, Aug. 5, 2026 (J4)
Reaction windows (JOBY-2026-08-05): not provided yet.
Items to check
- Stated in all three letters; Feb. table showed Stage 2 at 97%.
- Same status in both letters; no Dubai passenger date given; the Aug. release does not mention Dubai.
Revenue mix
Insufficient history. 1 instance, below the minimum of 5, so no summary counts are shown.
“Revenue "mostly generated from the BLADE business"”
Shareholder letter, authors not named
Q1 2026 shareholder letter, May 5, 2026 (J2)
Reaction windows (JOBY-2026-05-05): not provided yet.
Items to check
- Aircraft revenue not separated; no flight-services split.
Timing statement
Insufficient history. 1 instance, below the minimum of 5, so no summary counts are shown.
“First passengers "later in 2026" / "target of carrying first passengers in 2026"”
Shareholder letter, authors not named
Q4 2025 shareholder letter, Feb. 25, 2026 (J1)Q2 2026 results release, Aug. 5, 2026 (J4)
Reaction windows (JOBY-2026-08-05): not provided yet.
Items to check
- No dated launch; first eIPP flights "expected in September".
Undated milestone
Insufficient history. 1 instance, below the minimum of 5, so no summary counts are shown.
“strongest progress yet in the fifth and final stage”
Shareholder letter, authors not named
Q4 2025 shareholder letter, Feb. 25, 2026 (J1)Q2 2026 shareholder letter, Aug. 5, 2026 (J3)
Reaction windows (JOBY-2026-08-05): not provided yet.
Items to check
- No completion timeline; stage percentages after Feb. 20 not readable in the extractions; Feb. table: Stage 4 at 12% (Joby) and 4% (FAA).
Evidence balance
Not provided yet: the report has no paired mixed signals. No net score is computed.